flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Austin FC’s Q2 Stadium completes

Sports and Recreational Facilities

Austin FC’s Q2 Stadium completes

Gensler designed the project.


By David Malone, Managing Editor | August 5, 2021
Austin FC’s Q2 Stadium

Photos courtesy Gensler

Q2 Stadium, a new 20,000-seat stadium for Austin FC, has completed construction. The Gensler-designed project capitalizes on its natural landscape, the city’s cultural heritage, and its tech-forward growth.

The project features one of the largest roofs on a soccer-specific stadium, which will cover every seat, protecting fans from rain and sun. The canopy enclosure features a combination of customized curved metal panel systems on the bullnose, soffit, and edges; and a single-ply roofing on the top side of the canopy. The stadium is also oriented on its site to pull in breezes aided by open corners, an open-air concourse, and breathable mesh fabric seats.

 

Q2 Stadium pitch

 

Open concourses and standing areas allow fans to move around and socialize or visit local food vendors. VIP guests can access hospitality-inspired air-conditioned clubs and suites. Multiple outdoor spaces surround Q2 Stadium, including an outdoor amphitheater and a stage for live music. Outdoor spaces are open to the public on non-game days and can host farmer’s markets and concerts.

 

Q2 Stadium store

 

Q2 Stadium is the first MLS stadium to use Whole Building Life Cycle Analysis (WBLCA) to environmentally optimize the structure and enclosure and reduce embodied carbon. The WBLCA illustrated the environment savings achieved through the use of a cable system to support portions of the roof, as well as optimizations to the concrete mix designs.

In addition to Gensler’s design, the project was delivered with Walter P Moore’s multi-discipline service approach, which includes structural engineering, enclosure engineering, water proofing consulting, construction engineering, and whole building life cycle assessment.

 

Q2 stadium dining

 

Q2 Stadium restaurant

Related Stories

| Apr 10, 2014

Collegiate sports becoming greener: Survey

A survey conducted from May through June 2013 by the University of Arizona Office of Sustainability and published by the Natural Resources Defense Council (NRDC)* finds that more collegiate athletic teams are adopting green and sustainable practices in operation of their sports facilities.

| Apr 9, 2014

Colossal aquarium in China sets five Guinness World Records

With its seven salt and fresh water aquariums, totaling 12.87 million gallons, the Chimelong Ocean Kingdom theme park is considered the world’s largest aquarium.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 25, 2014

Sydney breaks ground on its version of the High Line elevated park [slideshow]

The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 13, 2014

Do you really 'always turn right'?

The first visitor center we designed was the Ernest F. Coe Visitor Center for the Everglades National Park in 1993. I remember it well for a variety of reasons, not the least of which was the ongoing dialogue we had with our retail consultant. He insisted that the gift shop be located on the right as one exited the visitor center because people “always turn right.” 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

| Feb 26, 2014

Billie Jean King National Tennis Center serving up three-phase expansion

The project includes the construction of two new stadiums and a retractable roof over the existing Arthur Ashe Stadium. 

boombox1 - default
boombox2 -
native1 -

More In Category



Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021