flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

17-story Data Sciences building to rise on Boston University campus

University Buildings

17-story Data Sciences building to rise on Boston University campus

KPMB Architects is designing the project.


By David Malone, Associate Editor | April 9, 2019
BU data sciences building

All renderings courtesy KPMB

The design of Boston University’s Data Science building is sure to turn some heads when it completes in 2022. The 17-story, 345,000-sf building will resemble a stack of books rising up from a podium on the university’s central campus. For the first time, BU’s mathematics, statistics, and computer science departments will be under one roof, maximizing collaboration, interaction, and interconnectivity.

The building’s transparent, porous podium will occupy the entire width of the site to complete the streetscape and generate maximum group floor animation on Commonwealth Avenue. It will rise four-stories and accommodate the larger programmatic volumes and offer a series of zones for interaction, including the Cafe, the Cascading Stair, the Street Studio, and the Fireplace Lounge.

 

Data Sciences building BU

 

Atop the podium will sit an additional 13 floors, each one slightly off center from the one below to create the stack of books aesthetic. Floors three through five will house the mathematics and statistics department (the fifth floor will also have a lunch space and meeting rooms). Floors six through 10 will comprise mainly space for the computer science department. The interdisciplinary Hariri Institute will be located on the top six floors, with floors 11 and 12 housing administrative offices.

 

See Also: Denning House completes at Stanford University

 

Interior Data Sciences building

 

The building will include a series of terraced platforms for small group interaction, whiteboard walls, and a collaboration ramp stippled with gathering spaces.

On the team: BRA (MEP), Entuitive + LeMessurier (structural engineer), Richard Burck (landscape architect), and Nitsch Engineering (civil engineer). Construction is expected to begin this spring.

 

BU data sciences building as seen from afar

Related Stories

| Aug 30, 2013

Modular classrooms gaining strength with school boards

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 19, 2013

Reconstruction Sector Construction Firms [2013 Giants 300 Report]

Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 2, 2013

LEED v4 gets green light, will launch this fall

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.

boombox1
boombox2
native1

More In Category


Mass Timber

Mass timber a big part of Western Washington University’s net-zero ambitions

Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021