flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

11 hot BIM/VDC topics for 2013

11 hot BIM/VDC topics for 2013

A roundup of the hottest building information modeling themes on BDCnetwork.com.


By BD+C Staff | October 30, 2013
building exterior
building exterior

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics. The following collection of feature stories and case studies is based on the number of BDCnetwork.com readers who clicked on the article in the past 10 months. The topics range from BIM for facilities management applications to modular data centers to augmented reality.  

 

 

1. “BIM Becomes VDC”

By John Tobin, LEED AP, Director of Architecture, EYP Architecture & Engineering

The disruptive growth of BIM has been largely due to the unanticipated interest contractors have taken in the technology. Contractors have grasped the power of BIM with far more vigor than designers. Contractors look at BIM models and immediately understand how they could be used for VDC tasks. www.BDCnetwork.com/vdc

 

 

2. “Augmented reality goes mainstream: 12 applications for design and construction firms”

By David Barista, Editor-in-Chief, BD+C

Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site. This article offers a dozen distinct applications for augmented reality and profiles one of the nation’s largest AR implementations: the Oakland Medical Center Replacement. www.BDCnetwork.com/ar

 

 

3. “’My BIM Journey’ – 6 Lessons from a BIM/VDC Expert”

By Jared Krieger, AIA, LEED AP, Project Manager, Gensler

From applying the two-inch rule to simplifying the BIM execution plan, Gensler’s Jared Krieger offers valuable advice for taming BIM/VDC workflows based on his five-year journey with the technology. Krieger discusses how to prepare for virtual coordination meetings, work more effectively with subs on BIM-driven projects, and apply clash detection tools more effectively. www.BDCnetwork.com/mybim

 

 

4. “World’s tallest children’s hospital pushes BIM to the extreme”

By David Barista, BD+C

Learn how the Building Team for the 23-story Lurie Children’s Hospital in Chicago implemented an integrated BIM/VDC/IPD workflow. This report includes an in-depth look at the coordination of the tower’s 10th-floor mechanical space, which, according to the Building Team, could not have been built within the time frame and budget without the use of BIM and VDC. www.BDCnetwork.com/bimhospital

 

 

5. “Level of Development: Will a new standard bring clarity to BIM model detail?”

By Jeffrey Yoders, Contributing Editor, BD+C

This article breaks down the Levels of Development Specification developed by BIMForum. The document will allow Building Teams to specify and articulate with a high level of clarity the content and reliability of BIM models at various stages of development. www.BDCnetwork.com/levels

 

 

6. “BIM 2.0: AEC firms share their vision for the great leap forward in BIM/VDC implementation”

By David Barista, BD+C

For our 2013 Giants 300 Report, BD+C reached out to dozens of AEC firms that made our annual BIM Giants lists and asked one simple question: What does BIM 2.0 look like to you? What they had to offer ranged from augmented reality applications to “smart” job sites to BIM for O&M tasks. www.BDCnetwork.com/bim2.0

 

 

7. “5 tips for running a successful BIM coordination meeting”

By Jared Krieger, AIA, LEED AP, Project Manager, Gensler

BIM tools are great, but if you can’t run efficient, productive coordination meetings, the Building Team will never realize the benefits of true BIM coordination. The author offers helpful tips for making the most of BIM coordination meetings based on his experience working on BIM/VDC-driven projects. www.BDCnetwork.com/5tips

 

 

8. “Hospital project pioneers BIM/VDC-based integrated project delivery”

By Jeffrey Yoders, Contributing Editor, BD+C

Everyone talks about the need to bring together BIM/VDC and integrated project delivery in the design and construction of complex projects, but so far there have been few cases of true integration. Jeffrey Yoders profiles one of these rare projects: the Marlborough Hospital Cancer Pavilion. www.BDCnetwork.com/ipdhospital

 

 

9. “Electronic surveying improves accuracy on BIM-driven hospital project”

By Robert Cassidy, Editorial Director, BD+C

In the rapidly changing world of virtual design and construction, the MEP component of building information modeling has earned a reputation as something of a technology laggard. That negative perception is changing, as MEP engineers find new ways to put BIM to use. www.BDCnetwork.com/surveying

 

 

10. “BIM-driven prototype turns data centers into a kit of parts”

By Ryan Schultz and Timothy Connor, Architects, Sheehan Partners

Considering their predominantly functional and technical nature, data centers are becoming as much a product as they are a building. This article explores a BIM-designed data center prototype that takes advantage of mass customization of assemblies to achieve higher levels of efficiencies. www.BDCnetwork.com/bimdatacenters

 

 

11. “7 ways it pays to use BIM for data centers”

By David Barista, BD+C

Perhaps no other project type stands to benefit more from coordination using BIM and VDC than data centers. This article explores how AEC firms and owners are getting the most bang for the buck when using BIM/VDC on data centers. www.BDCnetwork.com/7ways

 

For more BIM articles, visit: www.BDCnetwork.com/bimit

Related Stories

BIM and Information Technology | Jun 15, 2015

Arup report predicts future of manufacturing

Human-robot collaboration, self-cleaning and self-healing materials, mass customization, and 3D printing will herald a new "golden age" of production.

BIM and Information Technology | Jun 14, 2015

Deep data: How greater intelligence can lead to better buildings

The buzzword may be “Big Data,” but the reality is that Building Teams need to burrow deep into those huge datasets in the course of designing and building new facilities. Much of the information is free. You just need to dig for it. 

Smart Buildings | Jun 11, 2015

Google launches company to improve city living

The search engine giant is yet again diversifying its products. Google has co-created a startup, called Sidewalk Labs, that will focus on “developing innovative technologies to improve cities.”

Seismic Design | Jun 9, 2015

First building-specific earthquake warning system installed in North Portland, Ore.

The ShakeAlarm system recognizes and quantifies the faster but lower-energy seismic P-wave, which is the precursor to the more damaging S-wave. 

BIM and Information Technology | Jun 8, 2015

Ready for takeoff: Drones await clearance for job site flights

The fog is finally lifting on who will be allowed to pilot unmanned aerial vehicles. 

Green | Jun 8, 2015

Diamond Schmitt Architects creates tool to compare energy use data across building types

The firm's new ecoMetrics tool allows for a comprehensive analysis of data from energy simulation models across a wide range of the company’s building types.

BIM and Information Technology | Jun 5, 2015

Backpack becomes industry first in wearable reality capture

Combining five high-dynamic cameras and a LiDAR profiler, Leica's Pegasus:Backpack creates a 3D view indoors or outdoors for engineering or professional documentation creation.

BIM and Information Technology | Jun 4, 2015

Why reality capture is essential for retrofits

Although we rely upon as-built drawings to help us understand the site for our design, their support is as thin as the paper they are printed on, write CASE's Matthew Nelson and Carrie Schulz.

BIM and Information Technology | Jun 3, 2015

More accurate GPS ready to change the way we shop, interact, and explore

New technology reduces location errors from the size of a car to the size of a nickel—a 100 times increase in accuracy. This is a major technological breakthrough that will affect how we interact with environments, the places we shop, and entertainment venues.

Sponsored | BIM and Information Technology | May 28, 2015

Does BIM Work as a Deliverable?

Sasha Reed sits down with industry professionals at the BIMForum in San Diego to talk about BIM technology.

boombox1 - default
boombox2 -
native1 -

More In Category

AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021