flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Waterfront Station II breaks ground in Washington, D.C.

Mixed-Use

Waterfront Station II breaks ground in Washington, D.C.

The mixed-use project will include 30% affordable housing.


By David Malone, Managing Editor | January 5, 2022
Waterfront Station II
Renderings courtesy Hoffman & Associates

Hoffman & Associates has recently announced the groundbreaking of Waterfront Station II, a mixed-use development located in the heart of Southwest D.C. The project is less than one block from the Waterfront Station green line metro stop and three blocks from The Wharf neighborhood.

Upon completion, the 12-story, 400,000-sf building will include a mix of market-rate and affordable residences and retailers including a performing arts theater space, AppleTree Public Charter School, and a neighborhood restaurant by Good Company Doughnuts. Modern design elements will include angular glass balconies that mirror the waves of the nearby waterfront and contemporary interior finishes.

Waterfront Terrace II aerial

The projectā€™s residential component includes 449 apartment units ranging from studios to two-bedrooms. Thirty percent of the units (136) will be designated affordable housing units. Of those 136 units, 68 will be available to households earning at 30% of the area median income and 68 for households earning at 50% of the area median income.

Waterfront terrace ground level

Waterfront Station II will feature more than 19,000 sf of outdoor and interior amenity space. The property will offer 13 distinct amenity areas across four floors of the building. Amenities will include a 2,200-sf coworking and communal gathering space, a 3,000-sf fitness center, entertainment and hospitality lounges, and a library. Outdoor amenities include a second-floor courtyard and a rooftop terrace and pool.

Waterfront Station II is anticipated to complete in winter 2023.

Tags

Related Stories

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicagoā€™s Aqua Tower wins international design award

AquaĀ was named both regional and international winner of theĀ International Property AwardĀ as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicagoā€™s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the buildingā€™s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention CenterĀ to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92Ā million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā