flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Waterfront Station II breaks ground in Washington, D.C.

Mixed-Use

Waterfront Station II breaks ground in Washington, D.C.

The mixed-use project will include 30% affordable housing.


By David Malone, Managing Editor | January 5, 2022
Waterfront Station II
Renderings courtesy Hoffman & Associates

Hoffman & Associates has recently announced the groundbreaking of Waterfront Station II, a mixed-use development located in the heart of Southwest D.C. The project is less than one block from the Waterfront Station green line metro stop and three blocks from The Wharf neighborhood.

Upon completion, the 12-story, 400,000-sf building will include a mix of market-rate and affordable residences and retailers including a performing arts theater space, AppleTree Public Charter School, and a neighborhood restaurant by Good Company Doughnuts. Modern design elements will include angular glass balconies that mirror the waves of the nearby waterfront and contemporary interior finishes.

Waterfront Terrace II aerial

The project’s residential component includes 449 apartment units ranging from studios to two-bedrooms. Thirty percent of the units (136) will be designated affordable housing units. Of those 136 units, 68 will be available to households earning at 30% of the area median income and 68 for households earning at 50% of the area median income.

Waterfront terrace ground level

Waterfront Station II will feature more than 19,000 sf of outdoor and interior amenity space. The property will offer 13 distinct amenity areas across four floors of the building. Amenities will include a 2,200-sf coworking and communal gathering space, a 3,000-sf fitness center, entertainment and hospitality lounges, and a library. Outdoor amenities include a second-floor courtyard and a rooftop terrace and pool.

Waterfront Station II is anticipated to complete in winter 2023.

Tags

Related Stories

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021