flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

U.S. hotel construction pipeline up 14% to close out 2022

Hotel Facilities

U.S. hotel construction pipeline up 14% to close out 2022

At the end of 2022’s fourth quarter, the U.S. construction pipeline was up 14% by projects and 12% by rooms year-over-year, according to Lodging Econometrics.


By Lodging Econometrics | January 23, 2023
U.S. hotel construction pipeline up 14% to close out 2022 Photo: Max Vakhtbovych via Pexels
Photo: Max Vakhtbovych via Pexels

In the most recent Construction Pipeline Trend Report for the United States (U.S.) from Lodging Econometrics (LE), at the close of 2022’s fourth quarter, the U.S. construction pipeline stands at 5,465 projects/650,626 rooms, up 14% by projects and 12% rooms Year-Over-Year (YOY).

In Q4, all stages of hotel construction in the U.S. experienced positive YOY growth. At the close of the quarter, there are 1,008 projects/135,492 rooms under construction, up 4% by projects and 3% rooms YOY. Projects scheduled to start construction in the next 12 months stand at 2,073 projects/235,222 rooms, up 14% by projects and 12% by rooms YOY. Projects and rooms in the early planning stage increased 18% and 17% YOY, respectively, reaching all-time high counts of 2,348 projects/279,912 rooms.

The 2023 outlook for the lodging industry looks strong, as it continues to recover from the lows experienced throughout the past two years. Although the U.S. and the hotel industry continue to face some economic challenges, travel and hotel bookings increased substantially during 2022 and the new construction pipeline in the U.S. continues to grow at a moderate pace with new project announcements and construction-starts increasing 35% YOY and 36% YOY, respectively. Hotel owners, investors, developers, and management groups see much opportunity in the year ahead.

At the end of the fourth quarter, brand conversion room counts reached record highs of 1,030 projects/102,162 rooms. The renovation pipeline also remained strong in Q4, reaching the highest project counts seen since Q1 2019, standing at 900 projects/148,105 rooms. Combined, renovation and conversion activity accounts for 1,930 projects/250,267 rooms, record-highs by projects and up 53% YOY by projects and 45% by rooms YOY.

Dallas, Atlanta lead the nation in hotel construction projects

The U.S. Markets with the greatest number of projects in the construction pipeline, at the end of the fourth quarter, are Dallas with 176 projects/20,790 rooms. Following are Atlanta with 145 projects/18,100 rooms, Los Angeles with 122 projects/19,419 rooms, Phoenix with 116 projects/16,229 rooms, and Nashville with 106 projects and 14,198 rooms.

Franchise companies topping the pipeline with the greatest project and rooms counts at Q4 are Marriott International with 1,490 projects/180,113 rooms, Hilton Worldwide with 1,378 projects/154,790 rooms, and InterContinental Hotels Group (IHG) with 789 projects/78,951 rooms.

The brands with the largest number of projects in the pipeline at Q4 close are Home2 Suites by Hilton, with 521 projects/53,735 rooms; Marriott’s TownePlace Suites with 320 projects/29,802 rooms; and InterContinental Hotels Group’s (IHG) Holiday Inn Express with 293 projects/27,817 rooms.

Throughout 2022, the U.S. opened 464 new hotels, accounting for 54,620 rooms, for a growth rate of 1.0%. LE analysts expect new hotel openings to increase in 2023 with 607 projects/72,665 rooms forecasted to open, representing a 1.3% supply increase; and in 2024, 722 projects/82,813 rooms are expected to open, for a 1.5% supply increase.

Related Stories

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| May 22, 2012

Batson-Cook names Partin VP of Business Development

Partin joins general contractor from Georgia Hospital Association.

| May 16, 2012

AEG releases 3D video of L.A.'s Farmers Field

The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

McCarthy completes Santa Barbara Cottage Hospital Replacement Facility

The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021