flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

University of Washington opens mass timber business school building

University Buildings

University of Washington opens mass timber business school building

The new Michael G. Foster School of Business Founders Hall completes the university’s expansion plan for the business school.


By Peter Fabris, Contributing Editor | November 13, 2022
LMN Architects designed the mass timber Michael G. Foster School of Business Founders Hall at the University of Washington
The use of mass timber lowers the project’s embodied carbon substantially with the use of Douglas fir creating a warm and inviting interior atmosphere. Photo courtesy LMN Architects

Founders Hall at the University of Washington Foster School of Business, the first mass timber building at Seattle campus of Univ. of Washington, was recently completed. The 84,800-sf building creates a new hub for community, entrepreneurship, and innovation, according the project’s design architect LMN Architects.

The design creates an intersection of three volumes hosting student-focused team collaboration spaces, program offices, classrooms, and gathering spaces, all connected by a five-story steel and wood feature stair that weaves through the mass timber structure.

The community connector houses the feature stair, circulation spaces, pre-function spaces, and two tiered classrooms that can be set for 65 or 135 students. The team bar provides 28 team and interview rooms, four executive conference rooms, a student commons with an outdoor terrace, and a rooftop event forum.

The building was organized to foster spontaneous and open interaction between staff, business professionals, and students by positioning program offices, alumni offices, and career services offices adjacent to student spaces on every level. With meeting spaces accessible to all for shared use, students and program staff will be able to interact with one another daily.

Mass timber construction cuts embodied carbon 

The use of mass timber lowers the project’s embodied carbon substantially with the use of Douglas fir creating a warm and inviting interior atmosphere. The exterior architectural expression draws from the material palette established by other Foster School buildings and reveals moments of the mass timber structure.

LMN Architects designed the mass timber Michael G. Foster School of Business Founders Hall at the University of Washington 2
The peeled-away brick façade paired with carefully placed glazing exposes the timber inside the building. Photo courtesy LMN Architects 

Founders Hall is the first new building to meet the University of Washington Green Building Standards, reducing carbon emissions by over 90%. The design takes advantage of Seattle’s weather by integrating natural and mechanical ventilation to provide a comfortable environment for users with minimal reliance on conditioned air. As an integrated element in both the interior and exterior expression, the building incorporates a mass timber structure with cross-laminated timber decking. This reflects the Foster School’s connection to the Northwest and the local wood products industry, also reducing the building’s embodied carbon by almost 60%.

Many of the existing nearby Douglas fir and sequoia trees on site were preserved. The peeled-away brick façade paired with carefully placed glazing exposes the timber inside the building while providing views of the Douglas firs, giving the higher floors of the building an immersive Northwest forest experience.

The project partnered with Aureus Earth, a provider of carbon offsetting incentive programs, to create a proof of concept for long-term biogenic carbon storage in a mass timber building. The building will store more than 1,000 tons of CO2 for decades, keeping carbon out of the atmosphere for the lifetime of the building.

On the project team: 
Owner and/or developer: The University of Washington
Design Architect: LMN Architects
Design-Builder: Hoffman Construction
MEP engineer: PAE Consulting Engineers
Structural engineer: Magnusson Klemencic Associates

Related Stories

Sponsored | | Feb 28, 2018

Quality Products Needed To Meet Green Building Standards Today

Sustainable healthcare facilities will need energy-efficient building enclosures from the outset.

Sponsored | | Feb 15, 2018

Fact vs. fiction: Hotel waterproofing in coastal zones

Sign up for our free March 6 webinar on “A Project Peer Review: The Single Most Important Factor in Reducing the Risk of a Mold and Moisture Lawsuit in Your Next Project”.

Building Materials | Dec 19, 2017

‘Ultra Violet’ is Pantone’s Color of the Year 2018

The color represents a symbol of counterculture, unconventionality, and artistic brilliance, according to Pantone.

Sponsored | Building Materials | Aug 24, 2017

Controlling condensation

No matter what structural material you build with, be it steel, concrete, or wood, water is the enemy.  

Sponsored | Building Materials | Aug 17, 2017

Teflon’s little brother is breathing new life into big design

Lighter than glass and 100% recyclable, one material takes center stage in the future of building.

Concrete | Jul 7, 2017

The secrets held within Ancient Roman concrete could improve future building practices

Not only has the concrete stood the test of time, but it has actually become stronger.

boombox1 - default
boombox2 -
native1 -

More In Category


Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021