flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

UNC Health Care’s Surgical Tower set to begin construction

Healthcare Facilities

UNC Health Care’s Surgical Tower set to begin construction

Skanska USA will build the project in three phases.


By David Malone, Associate Editor | November 5, 2019

All renderings courtesy UNC Health Care

Set to become the largest building on UNC Hospitals Chapel Hill campus, the new 335,000-sf Surgical Tower will enhance UNC Health Care’s ability to provide surgical and medical care for Carolina residents.

The seven-story tower will feature 24 operating rooms, two hybrid operating rooms, 56 pre- and post-operating rooms, and two floors of ICU space with 56 beds. The building will also include a basement level, a main reception and visitor waiting areas on each floor, offices and conference rooms, an indoor and outdoor staff lounge, and staff locker rooms. 

 

Surgical Tower aerial

 

Patient drop-off canopies at the Surgical Tower and the existing Children’s Hospital will also be built. Two overhead pedestrian bridges will connect existing parking decks and the Dental School building to the Surgical Tower. Finally, the project will include a three-story service connector, renovation work at the existing Ambulatory Patient Care Facility, and the expansion of the cafe in the existing part of the hospital.

 

Surgical Tower canopy

 

The project, which is being built by Skanska, will be constructed in three phases. Phase one will include site development work and the new connector basement construction, phase two will focus on deep foundation construction, and phase three will focus on the main Surgical Tower building work.

 

See Also: Design unveiled for the University of Maryland’s School of Public Policy building

 

Surgical Tower East Facade

 

Phase one’s site development will include extensive utility relocations, an upgraded storm and sanitary system, new chilled water and steam for the tower and adjacent buildings, and new electrical duct bank from a future generator plant.

The project is slated for completion in 2022.

 

Surgical Tower entry

 

Surgical Tower west facade

Related Stories

Healthcare Facilities | Jun 1, 2023

High-rise cancer center delivers new model for oncology care

Atlanta’s 17-story Winship Cancer Institute at Emory Midtown features two-story communities that organize cancer care into one-stop destinations. Designed by Skidmore, Owings & Merrill (SOM) and May Architecture, the facility includes comprehensive oncology facilities—including inpatient beds, surgical capacity, infusion treatment, outpatient clinics, diagnostic imaging, linear accelerators, and areas for wellness, rehabilitation, and clinical research.

Healthcare Facilities | May 19, 2023

A new behavioral health facility in California targets net zero energy

Shortly before Mental Health Awareness Month in May, development and construction firm Skanska announced the topping out of California’s first behavioral health facility—and the largest in the nation—to target net zero energy. Located in Redwood City, San Mateo County, Calif., the 77,610-sf Cordilleras Health System Replacement Project is slated for completion in late 2024.

3D Printing | May 12, 2023

World’s first 3D-printed medical center completed

3D construction printing reached new heights this week as the world’s first 3D-printed medical center was completed in Thailand.

Sustainability | May 11, 2023

Let's build toward a circular economy

Eric Corey Freed, Director of Sustainability, CannonDesign, discusses the values of well-designed, regenerative buildings.

Digital Twin | May 8, 2023

What AEC professionals should know about digital twins

A growing number of AEC firms and building owners are finding value in implementing digital twins to unify design, construction, and operational data.

Design Innovation Report | Apr 27, 2023

BD+C's 2023 Design Innovation Report

Building Design+Construction’s Design Innovation Report presents projects, spaces, and initiatives—and the AEC professionals behind them—that push the boundaries of building design. This year, we feature four novel projects and one building science innovation.

Sustainability | Apr 20, 2023

13 trends, technologies, and strategies to expect in 2023

Biophilic design, microgrids, and decarbonization—these are three of the trends, technologies, and strategies IMEG’s market and service leaders believe are poised to have a growing impact on the built environment.

Design Innovation Report | Apr 19, 2023

HDR uses artificial intelligence tools to help design a vital health clinic in India

Architects from HDR worked pro bono with iKure, a technology-centric healthcare provider, to build a healthcare clinic in rural India.

Healthcare Facilities | Apr 17, 2023

UC Irvine takes sustainability to new level with all-electric medical center

The University of California at Irvine (UCI) has a track record for sustainability. Its under-construction UCI Medical Center is designed, positioned, and built to preserve the nearby San Joaquin Marsh Reserve, to reduce the facility’s solar gain by 85%, and to be the first medical center in the country to operate on an all-electric central plant.

Healthcare Facilities | Apr 13, 2023

Healthcare construction costs for 2023

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021