flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Two new residential towers set to rise in Nashville

Multifamily Housing

Two new residential towers set to rise in Nashville

Goettsch Partners is designing the buildings.


By David Malone, Associate Editor | April 20, 2021
Alcove and Prime in downtown Nashville

All renderings courtesy Goettsch Partners/Giarratana LLC

Two new residential towers will soon grace the Nashville skyline. Alcove at 900 Church, a 34-story, 356-unit building, and Prime at 801 Church, a 38-story, 350-unit building, will be built concurrently on nearly an acre of land in downtown Nashville directly across from the mixed-use development Nashville Yards.

Alcove at 900 Church will include a glass facade and feature a stacked cube aesthetic. It will rise 416 feet. Prime at 801 Church has a smaller footprint than Alcove but retains the stacked glass cube style. Alcove will not feature any parking while Prime will include a 511-space parking garage. Prime will also include two retail spaces totaling approximately 2,600-sf. Spread across the two towers will be balconies, terraces, and a glass-bottomed cantilevered swimming pool.

 

Alcove Pool Deck

 

Both towers will feature elevator systems from Mitsubishi Electric US. Elevators will be equipped with the Mitsubishi Electric Sigma AI 2200C Destination Oriented Allocation System and Mitsubishi Electric’s touch-free elevator call system smartphone app. The system allows residents to call an elevator wirelessly prior to arriving at the elevator lobby, eliminating the need to directly interact with the elevator fixtures.

Both Alcove and Prime are being designed by Goettsch Partners and built by AECOM Hunt. Giarratana LLC is the developer. The towers are scheduled for completion in late 2023.

 

Alcove Terrace

Related Stories

| Jul 9, 2012

Oakdale, Calif., Heritage Oaks Senior Apartments opens

New complex highlights senior preferences for amenities.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

2011 Reconstruction Awards Profile: Ka Makani Community Center

An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 2, 2012

Building Team completes two additions at UCLA

New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.

| May 2, 2012

Public housing can incorporate sustainable design

Sustainable design achievable without having to add significant cost; owner and residents reap benefits

| Apr 27, 2012

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.

| Apr 19, 2012

KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed

First of eight buildings highlights unique amenities.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021