flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Tech school designed to prepare students for high-wage, high-skill careers

Projects

Tech school designed to prepare students for high-wage, high-skill careers

A Florida high school gets a space whose design serves its disciplines.


By Novid Parsi, Contributing Editor | March 31, 2022
KRAI ext
KRAI is not supposed to look like any other school you have seen before.

In Wesley Chapel, Fla., a half-hour north of Tampa, Kirkland Ranch Academy of Innovation (KRAI) is “not going to look like anything you’ve ever seen before,” Kim Moore, assistant superintendent at Pasco County Schools, said in a statement. “This is going to be a cool school.”

Set to open for the 2022-23 school year, the 180,000-square-foot building will focus on Career and Technical Education (CTE), preparing students for high-wage, high-skill, and high-demand careers. It will offer hands-on, interactive learning that teaches skills more than theory—equipping students with the competencies they need to transition from high school to careers or college.

KRAI ext 2
The school is set to open for the 2022-2023 school year.

The purpose-built CTE high school will enroll more than 1,000 students, studying disciplines ranging from digital technology and engineering to biomedical science, cybersecurity, building construction, robotics, and more. Like the high-tech interdisciplinary buildings found on university campuses, KRAI is designed to fuel innovation, entrepreneurship, and career preparedness.

KRAI’s modern architecture and cantilevered entry canopy—hovering atop two simple columns—nod to the building sciences field, one of the school’s study areas. In addition to an open-air interior courtyard, the building will feature bridges, stairways, seating, and informal gathering areas—including a stage—that encourage incidental meetings and gatherings.

Every space is engineered to foster community and collaboration. A two-story collaboration hub, for instance, will include flexible furniture to support large gatherings and smaller-scale collaborations among students and outside partners. Like every space in the building, it will be bright, open, and reconfigurable.

KRAI ext 3
The space is meant to foster collaboration and community.

Each CTE classroom is designed to function as a makerspace, filled with professional-grade equipment, technology, and tools. These malleable spaces can change as career demands evolve.

CTE classroom
CTE classroom is a makerspace.

TRAI ext 3

Owner/developer: Pasco County Schools

Design architect: CannonDesign

Architect of record: Hepner Architects

MEP engineer: Engineering Matrix 

Structural engineer: DeCaroWillson

General contractor/construction manager: Creative Contractors

Related Stories

| Jul 11, 2014

Are these LEGO-like blocks the future of construction?

Kite Bricks proposes a more efficient way of building with its newly developed Smart Bricks system.

| Jun 11, 2014

David Adjaye’s housing project in Sugar Hill nears completion

A new development in New York's historic Sugar Hill district nears completion, designed to be an icon for the neighborhood's rich history.

| Apr 8, 2014

Fire resistive curtain wall helps The Kensington meet property line requirements

The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.

| Mar 25, 2014

Sydney breaks ground on its version of the High Line elevated park [slideshow]

The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.

| Jan 28, 2014

2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs

Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry. 

| Jan 21, 2014

2013: The year of the super-tall skyscraper

Last year was the second-busiest ever in terms of 200-meter-plus building completions, with 73 towers, according to a report by the Council on Tall Buildings and Urban Habitat.

| Sep 23, 2013

Six-acre Essex Crossing development set to transform vacant New York property

A six-acre parcel on the Lower East Side of New York City, vacant since tenements were torn down in 1967, will be the site of the new Essex Crossing mixed-use development. The product of a compromise between Mayor Michael Bloomberg and various interested community groups, the complex will include ~1,000 apartments.

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

| Apr 22, 2013

Top 10 green building projects for 2013 [slideshow]

The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.

| Feb 28, 2013

Greeening Silicon Valley: Samsung's new 1.1 million-sf HQ

Samsung Electronics' new 1.1 million sf San Jose campus will support at least 2,500 sales and R&D staff in the company's semiconductor and display businesses.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021