flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

Mixed-Use

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

The project is part of the updated Porta Romana railway yard master plan.


By David Malone, Managing Editor | July 16, 2021
SOM Olympic Village aerial
SOM Olympic Village aerial

Following an international competition that featured 27 groups comprised of 71 studios from nine different countries, SOM has been selected to design the Olympic Village for the 2026 Milan-Cortina Olympics.

The new Olympic Village will transform the Porta Romana district, creating a sustainable urban community and offer a new model for Olympic facilities to serve post-Olympic social goals. The village encompasses a set of public green spaces, the transformation of two historic structures, and six new mass timber residential buildings that will serve Olympic athletes in the short term.

 

SOM Olympic Village

 

After the Olympics, the athletes homes will be reused for student housing; the park and railway side buildings near the Olympic Square will be used for affordable housing; and the Olympic Village Plaza will become a neighborhood square with shops, bars, restaurants, and cafes planned at street level, along with outdoor space for farmers’ markets and other community events.

“Rather than ceasing to be of use after the Olympics, the Porta Romana Olympic Village will ultimately become a vibrant, self-sustaining neighborhood built around the principles of social equity, environmental commitment, wellness, and inclusivity,” said SOM Design Partner Colin Koop, in a release. “The village adopts the rhythm of the area’s streetscape, creating a porous urban block with a variety of public spaces and communal anchors that will enhance Milan’s vibrant tapestry of ground floor experiences.”

 

SOM Olympic Village square

 

The new buildings take architectural inspiration from the historic buildings of Milan, featuring contemporary materials and communal terraces. Shaded by vertical plantings, these terraces serve as bridges between the buildings, becoming signature gathering spaces and outdoor study rooms for students. The integration of greenery within the outdoor areas will contribute to the neighborhood’s climate resilience while also creating space for urban farms that enable on-site for production.

 

SOM retail/cafe

 

The village’s mechanical systems will tie in to the precinct’s loops, with passive cooling strategies, solar panels, and rooftop gardens ensuring more than 30% of the energy used will be produced on site. Stormwater will be collected on site and reused, with a reduction in the use of drinking water by 50% and CO2 reduction of 40% for heating and cooling. The village will target minimal environmental impact in accordance with Nearly Zero Energy Building requirements.

Construction of the Olympic Village is slated to be completed by July 2025.

 

SOM Olympic Village terraces

Tags

Related Stories

Mixed-Use | Jul 22, 2015

Despite China's 'ghost cities,' the country continues construction boom

Cities continue to spring up in the heart of China. Designed to accommodate millions, many are still nearly empty.

High-rise Construction | Jul 13, 2015

Herzog & de Meuron’s triangle tower stirs controversy in Paris

The 590-foot glass pyramid building will include a 120-room hotel, 754,000 sf of office space, and cultural facilities.

High-rise Construction | Jul 7, 2015

Bjarke Ingels designs Frankfurt skyscraper with a surprise in the middle

Several levels in the center of the 185-meter tower are shifted outward to allow for terraces with city views.

Cultural Facilities | Jun 10, 2015

Artists turn oil tankers into architecture

Four Dutch artists propose transforming tankers into monuments with mixed-use space.

Wood | Jun 2, 2015

Michael Green Architecture designs world's tallest wood building for Paris competition

“Just as Gustave Eiffel shattered our conception of what was possible a century and a half ago, this project can push the envelope of wood innovation with France in the forefront," said architect Michael Green of the project.  

Smart Buildings | May 28, 2015

4 ways cold-climate cities can make the most of their waterfronts

Though cold-climate cities pose a unique challenge for waterfront development, with effective planning waterfront cities with freezing winter months can still take advantage of the spaces year-round.

Sponsored | Coatings | May 14, 2015

Prismatic coatings accent the new Altara Center

This multi-use campus will contain a university, sports facilities, medical center, and world-class shopping

Mixed-Use | May 10, 2015

Construction on Orlando’s massive ‘innovation hub’ is finally starting

The $1 billion Creative Village development will create a business and education hub.

High-rise Construction | May 6, 2015

Two new designs submitted for New York City Riverside Center

Both designs reference the cantilevers and other elements featured in architect Christian de Portzamparc’s original masterplan for the complex, which has now been scrapped.

Building Owners | May 6, 2015

Hackathons and RFCs: Why one developer killed the RFP

In lieu of an RFP process, Skanska Commercial Development hosted a three-week "hackathon" to find an architect for its 2&U tower in Seattle.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021