A new six-story, 276,000-sf courthouse is officially under construction in Nashville. The building was originally designed by Michael Graves Architecture & Design before being refined by Fentress Architects and built by Hensel Phelps Construction Company.
The $194.5 Nashville U.S. Courthouse will consolidate the footprint of the court and court-related tenant agencies. It will include underground parking, eight courtrooms, and 11 chambers. The facility is targeted to meet LEED Gold Certification.
See Also: Teen Center of Excellence under construction in Ferguson, Mo.
The building will be clad in all white architectural precast concrete with an acid etch finish. The facades for the entry and public areas of the building will be glass. The primary facade will be a grand aspidal curved wall with the entry rotunda at its center. Additionally, jury suites will be stacked as towers in the exterior massing. The courthouse is slated for completion in spring 2021.
Related Stories
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.
| May 7, 2012
2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital
How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.
| May 2, 2012
Public housing can incorporate sustainable design
Sustainable design achievable without having to add significant cost; owner and residents reap benefits
| Apr 25, 2012
McCarthy introduces high school students to a career in construction
High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.
| Apr 24, 2012
AECOM design and engineering team realizes NASA vision for Sustainability Base
LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.
| Apr 20, 2012
McCarthy completes Santa Barbara Cottage Hospital Replacement Facility
The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.
| Apr 20, 2012
Century-old courthouse renovated for Delaware law firm offices
To account for future expansion, Francis Cauffman developed a plan to accommodate the addition of an 8-story tower to the building.
| Apr 20, 2012
Registration open for Solar Power International 2012 in Orlando
President Bill Clinton to deliver keynote address at ?largest solar energy event in the Americas.
| Apr 19, 2012
Nauset begins work on $20M Joint Forces HQ at Hanscom AFB
3D imaging key to project timetable and cost containment.