flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Six finalists selected for London’s Illuminated River competition

Architects

Six finalists selected for London’s Illuminated River competition

The competition is searching for the best design for lighting the bridges of central London.


November 11, 2016

Rendering courtesy of Adjaye Associates via The Illuminated River Foundation

The Illuminated River Foundation set up a competition to find the best lighting design scheme for London’s bridges along the river Thames. The project focuses on 17 individual crossings from Albert to Tower with the main goal of unifying these bridges via a light scheme that celebrates the city’s link with the river.

The competition has recently been narrowed down to six shortlisted teams and design concepts from over 100 submissions. The concepts from each team consist of the lighting design for the Chelsea, London, Waterloo, and Westminster bridges as well as a masterplan for the main road, rail, and pedestrian bridges.

Each design is currently on display in a free exhibition located at London’s Royal Festival Hall. A winning design will be selected by a jury of 11 professionals who are being advised by a supporting panel of bridge technicians, green technology and environment experts, and a lighting designer. The jury will make its final decision on Dec. 8, 2016 with the first phase of the project planed to begin in 2018.

You can view videos of each of the shortlisted teams’ concepts below. Click on the concept name for more information.

 

Blurring Boundaries

Adjaye Associates

 

 

The Eternal Story of the River Thames

AL_A

 

 

Synchronizing the City: Its Natural and Urba Rhythms 

Diller Scofidio + Renfro

 

 

Current

Leo Villareal with Lifschutz Davidson Sandilands and Future\Pace

 

 

A River Ain't Too Much To Light

Les Éclairagistes Associés, ecqi ltd., and Federico Pietrella

 

 

Thames Nocturne

Sam Jacob Studio and Simon Heijdens

 

Related Stories

| May 1, 2012

Time-lapse video: World Trade Center, New York

One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.

| May 1, 2012

Bruce E. Brooks Associates announces new commissioning subsidiary

Brooks + Wright Commissioning to be led by Will Wright.

| May 1, 2012

Young rejoins Altoon Partners

Takes on role of director of strategic development.

| May 1, 2012

Gilbane to build $100 million cranberries manufacturing facility

Gilbane to provide design build services for a new Lean manufacturing facility for Ocean Spray Cranberries Inc., beverage products.

| May 1, 2012

Construction is underway on MLK ambulatory care center in L.A.

Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.

| Apr 30, 2012

Virginia Commonwealth unveils design for Arts Institution

Institute for Contemporary Art will serve as a catalyst for exhibitions, programs, research and collaboration.

| Apr 30, 2012

Summit Design + Build completes build-out for Office Concepts

The project is seeking LEED ID Silver certification from the U.S. Green Building Council.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 30, 2012

Gilbane to manage retrofit of the Fraunhofer CSE R&B structure

Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.

| Apr 30, 2012

KBE Building completes renovation at the ConnCAT

The $1.2 million project consisted of a 16,000-sf interior renovation.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Mass timber a big part of Western Washington University’s net-zero ambitions

Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021