flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Silver Award: Hanna Theatre, Cleveland, Ohio

Silver Award: Hanna Theatre, Cleveland, Ohio


August 11, 2010
This article first appeared in the 200909 issue of BD+C.
The Hanna Theatre is the last of five theaters in Cleveland’s Playhouse
Square to be renovated and “reimagined” for modern audiences.

Between February 1921 and November 1922 five theaters opened along a short stretch of Euclid Avenue in downtown Cleveland, all of them presenting silent movies, legitimate theater, and vaudeville. During the Great Depression, several of the theaters in the unofficial “Playhouse Square” converted to movie theaters, but they all fell into a death spiral after World War II. By 1969, four of the five were forced to close.

Only the Hanna Theatre stayed alive, limping along into the '80s with local theater productions and the occasional Broadway preview, until it too went dark in 1989. Ten years later, an investment group led by Playhouse Square—a preservation organization that had already saved Hanna's cousins, the Allen, Ohio, State, and Palace theaters—acquired the historic Hanna Building with the goal of making the Hanna Theatre the permanent home of the Great Lakes Theater Festival.

For local A/E firm Westlake Reed Leskosky, the task of revitalizing the Hanna was compounded by the added assignment of making the space conducive to live concerts, stand-up comedy, corporate outings, and other events for which it was never intended.

WRL's new design significantly reconfigured the original 1,400-seat proscenium stage theater into an intimate 548-seat thrust stage, fully flexible in three independent sections, and adaptable to a 572-seat proscenium mode. Equipped with hydraulic lifts that can raise and lower parts of the stage at a rate of up to two feet per second as well as a new structurally independent fly system and improved acoustical, A/V, and lighting systems, the venue provides unparalleled production flexibility. General contractor Turner Construction completed the project in 8½ months, in time for the theater's opening performance September 20, 2008. —Jeffrey Yoders, Senior Associate Editor

Related Stories

Performing Arts Centers | Jun 30, 2017

L.A.’s John Anson Ford Amphitheater might finally be ready for its close-up

The performing arts venue, nearly a century old, has undergone an extensive refurbishing.

Building Team | Jun 27, 2017

Bruner Foundation announces 2017 Rudy Bruner Award for Urban Excellence gold and silver medalists

The SteelStacks Arts and Cultural Campus in Bethlehem, Pa., receives the gold medal and $50,000.

Libraries | May 31, 2017

A year after its facelift, Boston’s Public Library is relevant again

Visitors are flocking to its brighter, connected halls, which now include retail and digital components. 

Cultural Facilities | May 25, 2017

The Shed, a multi-arts center on New York’s west side, moves forward in construction and funding

The facility, designed for maximum programming flexibility, includes a massive movable shell. 

Cultural Facilities | May 4, 2017

Obama Foundation reveals first look at the Obama Presidential Center

The design comprises three buildings set in the public space of Jackson Park on Chicago’s South Side.

Performing Arts Centers | Mar 6, 2017

An oval defines the Frank Gehry-designed Pierre Boulez Saal concert hall

The hall hosted its debut concert on Saturday, March 4 with a performance by the Boulez Ensemble.

Cultural Facilities | Mar 2, 2017

The Hanoi Lotus Centre will bloom from the middle of a lake

The building will act as a symbol of growth and prosperity for the city of Hanoi.

Cultural Facilities | Jan 30, 2017

Former windmill factory proposed as new ‘vibrant culture house’

The transformed building would provide space for street sports, street culture, and street art.

Cultural Facilities | Dec 14, 2016

Institutions aggressively targeting private donors to fund construction projects

Capital campaigns abound, even though government financing still plays a vital role.

Cultural Facilities | Oct 27, 2016

Zaha Hadid Architects’ Urban Heritage Administration Centre takes its design from the surrounding desert

The futuristic curves that have become a staple for ZHA-designed buildings are also on full display.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021