flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Silver Award: Hanna Theatre, Cleveland, Ohio

Silver Award: Hanna Theatre, Cleveland, Ohio


August 11, 2010
This article first appeared in the 200909 issue of BD+C.
The Hanna Theatre is the last of five theaters in Cleveland’s Playhouse
Square to be renovated and “reimagined” for modern audiences.

Between February 1921 and November 1922 five theaters opened along a short stretch of Euclid Avenue in downtown Cleveland, all of them presenting silent movies, legitimate theater, and vaudeville. During the Great Depression, several of the theaters in the unofficial “Playhouse Square” converted to movie theaters, but they all fell into a death spiral after World War II. By 1969, four of the five were forced to close.

Only the Hanna Theatre stayed alive, limping along into the '80s with local theater productions and the occasional Broadway preview, until it too went dark in 1989. Ten years later, an investment group led by Playhouse Square—a preservation organization that had already saved Hanna's cousins, the Allen, Ohio, State, and Palace theaters—acquired the historic Hanna Building with the goal of making the Hanna Theatre the permanent home of the Great Lakes Theater Festival.

For local A/E firm Westlake Reed Leskosky, the task of revitalizing the Hanna was compounded by the added assignment of making the space conducive to live concerts, stand-up comedy, corporate outings, and other events for which it was never intended.

WRL's new design significantly reconfigured the original 1,400-seat proscenium stage theater into an intimate 548-seat thrust stage, fully flexible in three independent sections, and adaptable to a 572-seat proscenium mode. Equipped with hydraulic lifts that can raise and lower parts of the stage at a rate of up to two feet per second as well as a new structurally independent fly system and improved acoustical, A/V, and lighting systems, the venue provides unparalleled production flexibility. General contractor Turner Construction completed the project in 8½ months, in time for the theater's opening performance September 20, 2008. —Jeffrey Yoders, Senior Associate Editor

Related Stories

Cultural Facilities | Aug 28, 2019

Seattle’s newest substation doubles as a civic amenity

The Denny Substation includes 44,000 sf of open space that invites local residents and visitors to frequent the complex.

Cultural Facilities | Aug 23, 2019

Snøhetta to design Shanghai Grand Opera House

The Opera House is part of a new urban master plan for Shanghai.

Cultural Facilities | Aug 19, 2019

Tanglewood in the Berkshires is now a year-round facility

It recently debuted three climate-controlled event spaces and an indoor-outdoor café

Cultural Facilities | Jul 15, 2019

Steven Holl Architects and Architecture Acts to design Ostrava Concert Hall in the Czech Republic

Their winning proposal was supported by six of the seven members of the jury.

Cultural Facilities | Jul 11, 2019

BIG’s MÉCA combines three regional art agencies into one loop

The project gives Bordeaux an art-filled public space from the waterfront to the city’s new urban room.

Cultural Facilities | Jul 1, 2019

MAD Architects' proposal for the Yiwu Grand Theater will be built on the Dongyang River

MAD beat out four other proposals for the opportunity to design the theater.

Multifamily Housing | Jun 27, 2019

David Baker Architects wins 2019 HUD 'best in affordable housing' honor

The firm's Williams Terrace project is the first dedicated housing for Charleston, S.C.’s low-income seniors. It's one of four developments to win 2019 AIA/HUD housing awards. 

Sports and Recreational Facilities | Jun 27, 2019

Foster + Partners unveils design of wooden boathouse for Row New York

The project will sit on the banks of the Harlem River in Sherman Creek Park.

Cultural Facilities | May 17, 2019

Mulva Cultural Center builds upon city's arts legacy

Former ConocoPhillips CEO and wife have donated millions for culture and education.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021