flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Seattle’s Sound Transit U District Station opens

Transit Facilities

Seattle’s Sound Transit U District Station opens

LMN Architects designed the project in collaboration with McMillen Jacobs Associates.


By David Malone, Managing Editor | October 11, 2021
wayfinding at u district station
Photos: Adam Hunter, LMN Architects

The new 105,000-sf U District Station in Seattle has opened.  The LMN Architects-designed project creates a unified transportation solution and offers a new gateway to the University of Washington campus.

The U District Station is a highly functional, easy-to-use, and appropriately scaled transit hub that is conveniently located for the diverse activities of daily commenting students, workers, and visitors. It is the first stop on the Northgate Link, a 4.3-mile light rail extension from the University of Washington Station on its way north.

The station’s train platform is located 85 feet below street level, with the bulk of the entire 105,000-sf area below grade. Each of the station’s two entrances provides elevators, escalators, and stairs to the trains below. The north entrance lobby serves riders heading to and from the adjacent Neptune Theater and mixed-use neighborhood, as well as a major Metro bus transfer hub on NE 45th Street. The south lobby gives pedestrians a direct link to the UW campus a few blocks east. The sidewalks and streets facing the entrances meet Green Street standards and feature ample landscaping, pedestrian lighting, seat walls, and a bike lane. Both entrance lobbies offer bicycle storage and racks.

U District Station platform

From the north and south lobbies, commuters descend through the escalator and stair tubes to a mid-level open landing that is placed within a tall voluminous central space. From here, they can continue to the train platform below via open escalators and an open stair. The landing appears to float above the angled cross-bracing elements and is offset to the east. This offset, along with artwork and video installation on the west wall, create a design asymmetry that helps to define north-south way finding and directionality on the platform.

The large central volume is defined by a white corrugated metal ceiling and canted walls that conceal essential back-of-house functions. Wayfinding is enhanced by overhead aluminum tubes containing lighting, speakers, and other systems. Two different colors aid passengers in orienting north and south: orange for north and blue for south.

The completed project anticipates record numbers of riders as Seattle’s urban evolution continues.

Related Stories

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

GSA celebrates 60th anniversary

The U.S. General Services Administration today is commemorating its 60th anniversary as it engages in one of its its most challenging assignments ever—helping to achieve the goals of the American Recovery and Reinvestment Act.

| Aug 11, 2010

Earthquake engineering keeps airport grounded

Istanbul, Turkey's new 2.15 million-sf Sabiha Gökçen International Airport opened on October 31, 2009, becoming the world's largest seismically isolated building. Arup's global airport planning and engineering team, in collaboration with architects Dogan Tekeli Sami Sisa Mimarlik Ofisi and contractor LIMAK-GMR JV, working within an 18-month timeline, designed and built the facility wi...

| Aug 11, 2010

Manhattan's Pier 57 to be transformed into $210 million cultural center

LOT-EK, Beyer Blinder Belle, and West 8 have been selected as the design team for Hudson River Park's $210 million Pier 57 redevelopment, headed by local developer Young Woo & Associates. The 375,000-sf vacant passenger ship terminal will be transformed into a cultural center, small business incubator, and public park, including a rooftop venue for the Tribeca Film Festival.

| Aug 11, 2010

Special Recognition: Triple Bridge Gateway, Port Authority Bus Terminal New York, N.Y.

Judges saw the Triple Bridge Gateway in Midtown Manhattan as more art installation than building project, but they were impressed at how the illuminated ramps and bridges—14 years in the making—turned an ugly intersection into something beautiful. The three bridges span 9th Avenue at the juncture where vehicles emerge from the Lincoln Tunnel heading to the Port Authority of New Yor...

| Aug 11, 2010

29 Great Solutions

1. Riverwalk Transforms Chicago's Second Waterfront Chicago has long enjoyed a beautiful waterfront along Lake Michigan, but the Windy City's second waterfront along the Chicago River was often ignored and mostly neglected. Thanks to a $22 million rehab by local architect Carol Ross Barney and her associate John Fried, a 1.

boombox1 - default
boombox2 -
native1 -

More In Category

Transit Facilities

Top 25 Transit Facility Construction Firms for 2023

The Walsh Group, Clark Group, Hensel Phelps, Skanska USA, and Hill International top BD+C's ranking of the nation's largest transit facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes construction revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Engineering Firms for 2023

AECOM, Jacobs, EXP, WSP, and Arup head BD+C's ranking of the nation's largest transit facility engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Architecture Firms for 2023

Perkins&Will, HDR, Gensler, Skidmore, Owings & Merrill, and HNTB top BD+C's ranking of the nation's largest transit facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021