flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

Mixed-Use

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

The mixed-use development will connect some of Detroit’s key public spaces.


By David Malone, Associate Editor | December 14, 2018
Monroe Blocks exterior

Courtesy Hayes Davidson

The northeast corner of Detroit’s Campus Martius Park will be home to Monroe Blocks, Schmidt hammer Lassen Architect’s first U.S. project. The project will span a 134,548-sf site across two city blocks and include the first high-rise office tower built in downtown Detroit in more than 25 years.

Monroe Blocks will include a mix of modern office space, residential units, restaurants, retail, and approximately 51,660 sf of public outdoor space. Schmidt Hammer Lassen will work with Neumann/Smith Architecture to reintroduce historic alleyways and public access points and prioritize the public realm by connecting the outdoors with each structure’s ground floor.

See Also: 62-story luxury rental tower provides 40,000 sf of indoor and outdoor amenities in Manhattan

 

Monroe Block retail spaceCourtesy Schmidt Hammer Lassen Architects.

 

The development is being built in an area that was known as Detroit’s first theater district. The National Theatre, the sole remaining building from this original theater district, will have its ornate terracotta archway incorporated into the Monroe Blocks design. It will be disassembled, catalogued, and relocated to a new pedestrian walkway that will bisect the new development.

 

Monroe Block interior office floorCourtesy Schmidt Hammer Lassen Architects.

 

A groundbreaking event recently took place on Monroe Banks Plot A, which will include a 35-storey glass and terracotta office tower, a 17-story, 148-unit residential building, and a total of 66,000 sf of retail space.

Monroe Blocks is scheduled to complete in early 2022.

 

Monroe Blocks aerial viewCourtesy Hayes Davidson.

 

Monroe Blocks courtyardCourtesy Hayes Davidson.

Tags

Related Stories

| Nov 16, 2010

CityCenter’s new Harmon Hotel targeted for demolition

MGM Resorts officials want to demolish the unopened 27-story Harmon Hotel—one of the main components of its brand new $8.5 billion CityCenter development in Las Vegas. In 2008, inspectors found structural work on the Harmon didn’t match building plans submitted to the county, with construction issues focused on improperly placed steel reinforcing bar. In January 2009, MGM scrapped the building’s 200 condo units on the upper floors and stopped the tower at 27 stories, focusing on the Harmon having just 400 hotel rooms. With the Lord Norman Foster-designed building mired in litigation, construction has since been halted on the interior, and the blue-glass tower is essentially a 27-story empty shell.

| Nov 3, 2010

Rotating atriums give Riyadh’s first Hilton an unusual twist

Goettsch Partners, in collaboration with Omrania & Associates (architect of record) and David Wrenn Interiors (interior designer), is serving as design architect for the five-star, 900-key Hilton Riyadh.

| Oct 6, 2010

From grocery store to culinary school

A former West Philadelphia supermarket is moving up the food chain, transitioning from grocery store to the Center for Culinary Enterprise, a business culinary training school.

| Sep 30, 2010

Luxury hotels lead industry in green accommodations

Results from the American Hotel & Lodging Association’s 2010 Lodging Survey showed that luxury and upper-upscale hotels are most likely to feature green amenities and earn green certifications. Results were tallied from 8,800 respondents, for a very respectable 18% response rate. Questions focused on 14 green-related categories, including allergy-free rooms, water-saving programs, energy management systems, recycling programs, green certification, and green renovation.

| Sep 13, 2010

Conquering a Mountain of Construction Challenges

Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.

| Aug 11, 2010

Accor North America launches green hotel pilot program

Accor North America, a division of Accor Hospitality, has announced that it will pilot the Green Key Eco-Rating Program within its portfolio in the United States in 2010. Green Key is the first program of its kind to rank, certify and inspect hotels and resorts based on their commitment to sustainable "green" practices; the Accor North America pilot will involve 20 properties.

| Aug 11, 2010

CTBUH changes height criteria; Burj Dubai height increases, others decrease

The Council on Tall Buildings and Urban Habitat (CTBUH)—the international body that arbitrates on tall building height and determines the title of “The World’s Tallest Building”—has announced a change to its height criteria, as a reflection of recent developments with several super-tall buildings.

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

See what $3,000 a month will get you at Chicago’s Aqua Tower

Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.

boombox1
boombox2
native1

More In Category




MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021