flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

Mixed-Use

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

The community’s goal is to provide 100% renewable energy to its houses and businesses.


By John Caulfield, Senior Editor | July 17, 2020

The Highland Bridge redevelopment in St. Paul, Minn., is expected to take 15 years to complete. Images: Ryan Companies

On a 122-acre site along the Mississippi River in St. Paul, Minn., where Ford Motor Co. operated a plant for 84 years until it closed in 2011, Ryan Companies recently broke ground virtually on an ambitious mixed-use development named Highland Bridge. When completed, this transformed community will feature 3,800 housing units, 265,000 sf of office space, 150,000 sf of retail space, 50,000 sf of civic or institutional space, and 55 acres of public and open space with over 10 bike and pedestrian paths covering five miles.

This $1.3 billion project—whose funding includes $320 million in public and private investments for parks, infrastructure, affordable housing, and tax-increment financing—has been a decade in the making. Bringing the master plan to life involved 45 public meetings that drew 1,300 attendees, and 80 presentations to business, civic, and nonprofit groups.

In 2017, Ford enlisted CBRE for the land-sale phase, and Ryan Companies was awarded the parcel in the spring of 2018. “We had a good partner in Ford, and the Mayor and City Council were supportive, and ultimately came to the table with a large public investment,” says Tony Barranco, Ryan Companies’ senior vice president of development. He adds that Ford “to its credit” let the city guide the redevelopment.

Also see: Video of virtual groundbreaking for Highland Bridge

Last December, Ryan and the city entered into a public-private partnernship. Ryan also partnered with Xcel Energy to achieve the goal of providing 100% renewable energy to the site through a subscription-based program that would allow residents and businesses to tap locally generated solar and hydro power. Electric charging stations will be available throughout the community’s six zoning districts.

Ryan is the master developer on Highland Bridge, and has about 200 employees working on this project, including its Ryan A+E group that is the architect and civil engineer. Barranco says that Ryan intends to subcontract some of the production and design.

Pulte Homes, the national brand of PulteGroup, the nation’s third-largest home builder, will build and deliver 320 row homes that range from 1,900 to 3,000 sf and whose prices will start in the upper $300,000s. Pulte plans to begin construction this winter, and deliver its first units during the Winter of 2021.

The communitiy's 55 acres of park and open space will include public plazas.

 

A MIX OF MARKET-RATE AND AFFORDABLE HOMES

One-fifth of Highland Bridge’s housing will be earmarked for low- and medium-income buyers. Three hundred eighty homes will target households earning 30% of the area median income, 190 units will target households earning 50% of AMI, with another 190 for households earning 60% of AMI. The builders Project for Pride in Living, CommonBond Communities, and Habitat for Humanity will deliver most of the affordable housing for the community.

Also see: New affordable housing development comes to the Bay Area

Twin Cities-based Presbyterian Homes will develop Highland Bridge’s senior living component. And Weidner Apartment Homes will be the primary developer of the community’s market-rate multifamily housing.

The development team for Highland Bridge also involves Wells Fargo (the financing partner for land acquisition and infrastructure development), CBRE (retail leasing), Colliers International (financing for tax-increment funds for infrastructure), the Capitol Regional Watershed District (stormwater management and watershed sustainability), and the Metropolitan Council (community planning).

Barranco says the buildout for Highland Bridge should be completed in 15 years. The initial infrastructure will be put in place by the fall of 2021, and the rest by 2025. The bulk of the vertical construction will be completed over the next five to 10 years. 

HIGH EXPECTATIONS

Water features will be among the public amenities at Highland Bridge.

 

“It’s an incredible piece of property, in an established neighborhood,” says Barranco. “It’s not often that you get the chance to redevelop 122 acres, and of all the challenges, probably the biggest is the massive expectation about getting it right.”

He says that project’s proximity to the Mississippi River “is definitely an asset” because of the river’s existing trail system and hydro-electric opportunities. He notes that there are setback and height requirements that the redevelopment must adhere to.

When asked whether current events gave Ryan pause about starting this project now, Barranco replies that “while we did not anticipate a pandemic, we were deliberate that [the plan] would be durable and might go through one or two recessions.”

Obviously, the city’s leaders are optimistic: Highland Bridge is expected to add $18 million per year in new tax revenue to St. Paul’s tax base.

Tags

Related Stories

| Aug 11, 2010

CityCenter projects get LEED Gold

MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...

| Aug 11, 2010

RMJM unveils design details for $1B green development in Turkey

RMJM has unveiled the design for the $1 billion Varyap Meridian development it is master planning in Istanbul, Turkey's Atasehir district, a new residential and business district. Set on a highly visible site that features panoramic views stretching from the Bosporus Strait in the west to the Sea of Marmara to the south, the 372,000-square-meter development includes a 60-story tower, 1,500 resi...

| Aug 11, 2010

'Feebate' program to reward green buildings in Portland, Ore.

Officials in Portland, Ore., have proposed a green building incentive program that would be the first of its kind in the U.S. Under the program, new commercial buildings, 20,000 sf or larger, that meet Oregon's state building code would be assessed a fee by the city of up to $3.46/sf. The fee would be waived for buildings that achieve LEED Silver certification from the U.

| Aug 11, 2010

Five-star resort breaks ground on the Black Sea

Construction work has commenced on a five-star resort and leisure destination along the Black Sea coast in Batumi, Georgia. The RTKL-designed resort consists of two towers rising 86 and 58 meters over a two-story podium. The larger tower contains 250 guestrooms and suites while the smaller tower offers 78 residential apartments.

| Aug 11, 2010

Outdated office tower becomes Nashville's newest boutique hotel

A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven "cardio" rooms.

| Aug 11, 2010

Aloft hotel opens at Washington National Harbor

A partnership of five developers, including the John Hardy Group and Peterson Companies, have completed a 190-room aloft hotel at Washington National Harbor, a mixed-use retail/entertainment development in Oxon Hill, Md., near Washington, D.C. Designed in conjunction with David Rockwell and the Rockwell Group, the aloft prototype offers atmospheric public spaces designed to draw guests from the...

| Aug 11, 2010

Manhattan's latest boutique hotel will be LEED Silver certified

New York-based developer Tribeca Associates has commissioned Brennan Beer Gorman Architects to design its latest mixed-use office and boutique hotel at 330 Hudson Street. Located in the downtown Hudson Square area of Manhattan, the LEED-Silver development will involve the redevelopment of a historic, eight-story warehouse building into 292,000 sf of office space, 15,000 sf of retail space, and ...

| Aug 11, 2010

Luxury Hotel required faceted design

Goettsch Partners, Chicago, designed a new five-star, 214-room hotel for the King Abdullah Financial District (KAFD) in Riyadh, Saudi Arabia. The design-build project, with Saudi Oger Ltd. as contractor and Rayadah Investment Co. as developer, has a three-story podium supporting a 17-story glass tower with a nine-story opening that allows light to penetrate the mass of the building.

| Aug 11, 2010

Westin Hotel

Mid-twentieth-century projects are in a state of limbo. In many cities, safeguards against quick demolition don't even cover “new” buildings built after 1939, yet many such buildings may be obsolete by current standards. The Farmers and Mechanics Savings Bank, located in downtown Minneapolis, was one such building, a rare example of architecture from a time when American design was ...

boombox1 - default
boombox2 -
native1 -

More In Category


MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021