flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Revitalization Efforts Advance in Hackensack, N.J.

Revitalization Efforts Advance in Hackensack, N.J.

Work progresses on Cultural and Performing Arts Center and Atlantic Street Park


By Posted by Raissa Rocha, Associate Editor | June 22, 2012

As the city of Hackensack, N.J., awaits final approval of its comprehensive rehabilitation plan, DMR Architects is progressing with other revitalization efforts within the downtown footprint. The firm is working with the city of Hackensack, N.J., to redevelop a specific area within the 163 acres in need of rehabilitation, the former Masonic Temple. 

Constructed in 1870, the Masonic Temple was previously vacant, for sale, and in arrears. In 2010, Hackensack purchased the building and hired DMR to complete Phase 1 plans to convert the building into a cultural and performing arts center, and convert the adjacent parking lot into a public park with outdoor performance space to benefit the surrounding commercial and office spaces. The building is nearing completion of Phase 1 and will open as a cultural arts center. Phase 2 will see renovations of the second floor into a performing arts center

When conversion of the adjacent parking lot is completed, the park will provide performance areas for spring and summer concerts, shaded outdoor space for lunch hours, an intimate garden, and outdoor chess tables.

“DMR is proud of our work in Hackensack, and we look forward to revitalizing the city into a vibrant center for thousands of residents, employees, and visitors,” said Lloyd A. Rosenberg, AIA, president and CEO of DMR Architects. “The Cultural and Performing Arts Center and Atlantic Street Park will support surrounding businesses and act as a catalyst of revitalization for the downtown area.”

Related Stories

University Buildings | Feb 18, 2022

On-campus performing arts centers and museums can be talent magnets for universities

Cultural facilities are changing the way prospective students and parents view higher education campuses.

Resiliency | Feb 15, 2022

Design strategies for resilient buildings

LEO A DALY's National Director of Engineering Kim Cowman takes a building-level look at resilient design. 

Cultural Facilities | Jan 27, 2022

Growth in content providers creates new demand for soundstage facilities

Relativity Architects' Partner Tima Bell discusses how the explosion in content providers has outpaced the availability of TV and film production soundstages in North America and Europe.

Cultural Facilities | Jan 18, 2022

A building in Times Square aspires to be a marketing and arts tool

The 580-ft TSX Broadway will have several LED signs on its exterior, and host an existing 27,000-sf theater that was hoisted 30 ft above street level. 

Cultural Facilities | Dec 16, 2021

Museums and other cultural spaces reconsider how to serve their communities

Efforts to raise capital for cultural buildings became necessary during the COVID-19 health crisis.

Giants 400 | Nov 19, 2021

2021 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector

Gensler, AECOM, Buro Happold, and Arup top BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Cultural Facilities | Nov 19, 2021

Goettsch Partners completes Lincoln Park Zoo’s Pepper Family Wildlife Center

The project doubles the size of the previous lion habitat.

Cultural Facilities | Nov 17, 2021

Henning Larsen-designed Shaw Auditorium opens at the Hong Kong University of Science and Technology

The project celebrated its grand opening as part of HKUST’s thirtieth anniversary celebration.

Cultural Facilities | Oct 19, 2021

Niagara Falls is getting a bigger Welcome Center

The GWWO Architects-designed building will mostly sit on the site of the center it replaces.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021