flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Renovation work outpaces new construction for first time in two decades

Reconstruction & Renovation

Renovation work outpaces new construction for first time in two decades

AIA's Architectural Billings Index reflects the growing wave of retrofit projects in the United States.


By Peter Fabris, Contributing Editor | November 8, 2022
Renovation work outpaces new construction for first time in two decades

Photo: Vine Ramazani via Unsplash

Renovations of older buildings in U.S. cities recently hit a record high as reflected in architecture firm billings, according to the American Institute of Architects (AIA). As of spring 2022, the majority of billings came from retrofit work, not new construction. It’s the first time in the 20 years AIA data has shown that renovations have surpassed 50%, Bloomberg reports.

In 2005, as a pre-recession building boom neared its end, renovations composed about one-third of billings. That share has been increasing steadily since 2017, when it was 44.4%, and has risen to 52% this year.

Kermit Baker, AIA's Chief Economist, says that the last time the market was so heavily weighted toward renovations was likely during the Great Depression.

One quarter of renovations are for conventional interior modernizations and upgrades, and another quarter are adaptive reuse projects that change the function and program of a building. New tenant fit-outs comprise 17.8% of renovations.

Related Stories

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| Sep 7, 2011

KLMK Group awarded contract with Louisiana’s Slidell Memorial Hospital

The renovation will include a 56,000-sf Emergency Room/Cardiology Expansion.

| Aug 31, 2011

Sebastopol, Cailf., invites designers to submit ideas for renewing city center

The goal of The Core Project is to explore how the physical presence of Sebastopol can become a more economically thriving and aesthetically vibrant place, reflecting the naturally beauty of the region and the character of the community. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021