flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Preservation lawsuit over Chicago's Prentice Hospital dropped

Preservation lawsuit over Chicago's Prentice Hospital dropped

Legal hurdle cleared for demolition of iconic modernist structure 


By BD+C Staff | February 15, 2013
End of preservation suit allows demolition of iconic modernist structure.
With end of a preservation lawsuit, demolition of iconic modernist structure will proceed.

The National Trust for Historic Preservation and Landmarks Illinois have dropped a lawsuit alleging that the city of Chicago improperly denied landmark status to Prentice Women's Hospital, an iconic modernist structure designed in the 1970s by Bertrand Goldberg. Owner Northwestern University will now be free to go forward with its plan to build a major new biomedical research facility on the downtown site.

The Prentice demolition has been under dispute for several years, as preservation enthusiasts attempted to make the case that the building, with its quatrefoil concrete shell cantilevered over a narrow core, was worth saving. Last November, in contentious proceedings, the Commission on Chicago Landmarks granted the building landmark status and then removed the designation on the same day.

After a hearing in Cook County Circuit Court, the preservation groups decided not to proceed. "We continue to believe there were significant flaws with the process that granted and then removed landmark protection for Prentice," said the National Trust in an official statement. "However, we feel that the landmarks process has run its course."

National Trust Field Officer Christina Morris said the groups will continue to cooperate with the city on preservation of historic structures, and that the Prentice situation has brought important attention to the role of modernist architecture in the U.S. “We will continue to work with our partners to preserve the best of Chicago’s architectural heritage.”

(http://www.chicagotribune.com/news/local/breaking/chi-lawsuit-dropped-over-prentice-preservation-20130214,0,3552305.story)

Related Stories

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

| Feb 22, 2012

CISCO recognizes Gilbane for quality construction, design, and safety

The project employed more than 2,000 tradespeople for a total of 2.1 million hours worked – all without a single lost-time accident. 

| Feb 14, 2012

The Jackson Laboratory announces Gilbane Building Co. as program manager for Connecticut facility

Gilbane to manage program for new genomic medicine facility that will create 300 jobs in Connecticut.

| Feb 13, 2012

WHR Architects renovation of Morristown Memorial Hospital Simon Level 5 awarded LEED Gold

Located in the Simon Building, which serves as the main entrance leading into the Morristown Memorial Hospital campus, the project comprises three patient room wings connected by a centralized nursing station and elevator lobby.

| Feb 13, 2012

New medical city unveiled in Abu Dhabi

SOM’s design for the 838-bed, three-million-square foot complex creates a new standard for medical care in the region.

| Feb 10, 2012

Mortenson Construction research identifies healthcare industry and facility design trends

The 2012 Mortenson Construction Healthcare Industry Study includes insights and perspectives regarding government program concerns, the importance of lean operations, flexible facility design, project delivery trends, improving patient experience, and evidence-based design. 

| Jan 31, 2012

Fusion Facilities: 8 reasons to consolidate multiple functions under one roof

‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series  on the design and construction of university facilities.

| Jan 31, 2012

Suffolk Construction to manage Lawrence & Memorial Hospital Cancer Center project in Waterford, Conn.

Leading construction management firm overseeing one of first healthcare projects in the country to utilize innovative IPD process.

| Jan 16, 2012

Suffolk completes construction on progressive operating suite

5,700 square-foot operating suite to be test bed for next generation of imaged-guided operating techniques.

| Jan 4, 2012

HDR to design North America’s first fully digital hospital

Humber River  is the first hospital in North America to fully integrate and automate all of its processes; everything is done digitally.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021