Prescient, a digital design-build company focused on modular multi-unit housing, has received certification from the International Code Council Evaluation Service (ICC-ES) for its Prescient Seismic System.
“With this certification, Prescient is now able to provide its unique, economical and environmentally friendly solution to developers building in U.S. seismic zones,” according to a Prescient news release. The technology is suitable for buildings up to 12 stories in earthquake-prone areas around the world.
More than 950 physical tests and over 80,000 analytical simulations of response to earthquake ground shaking were performed. “The work demonstrated that the PSS is able to meet the high performance standards for protecting life demanded by the most modern building codes,” the release says.
“With more than 30,000 engineering hours invested, this new Prescient Seismic System expands upon the fundamentals of our standard Unified Truss Configuration System (UTCS) to yield a more economical and faster building solution that can withstand high seismic forces,” said Magued Eldaief, CEO, Prescient. “The ability to now design buildings up to 160 feet high, or 12 stories above 4 stories of podium in seismic locations, is an incredible opportunity for us and one that will no doubt open doors to many future projects.”
Related Stories
| Feb 17, 2012
Comment period opens March 1 for LEED 2012 update
USGBC says that LEED's strength comes from its continuous evolution.
| Feb 17, 2012
OSHA training videos on proper respirator use available online
17 short videos to help workers learn about the proper use of respirators on the job.
| Feb 17, 2012
Union/employer collaboration on the rise aimed at exceeding OSHA safety standards
Unions have learned to help employers win contracts with bids made competitive through good safety practices.
| Feb 16, 2012
Gain greater agility and profitability with ArchiCAD BIM software
White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.
| Feb 9, 2012
Initiative to sell off under-used federal property gaining momentum
The bill is similar to a White House planto cut $8 billion worth of building costs by the end of the 2012 fiscal year, and to establish a panel to identify other sites worth selling or donating to nonprofits or state and local governments.
| Feb 9, 2012
Computer tool helps engineers design roof cladding using Canada's building code
Easier to design roof cladding that can withstand winds in a given area.
| Feb 9, 2012
Webinar focuses on lessons learned from LEED-certified industrial project
This case study will focus on strategies used to save the client money, achieve certification, and effectively market success once the project was complete.
| Feb 9, 2012
Rapid growth of zero energy buildings expected
Much of that growth will be in the European Union, where near-zero energy buildings are mandated by 2019 for public buildings, and by 2021 for all construction.
| Feb 9, 2012
Stiffer OSHA fines put strain on Kansas contractors
A fine for a violation that once cost between $750 and $1,200 now runs $7,000 or more per incident, according to a state industry association official.