Prescient, a digital design-build company focused on modular multi-unit housing, has received certification from the International Code Council Evaluation Service (ICC-ES) for its Prescient Seismic System.
“With this certification, Prescient is now able to provide its unique, economical and environmentally friendly solution to developers building in U.S. seismic zones,” according to a Prescient news release. The technology is suitable for buildings up to 12 stories in earthquake-prone areas around the world.
More than 950 physical tests and over 80,000 analytical simulations of response to earthquake ground shaking were performed. “The work demonstrated that the PSS is able to meet the high performance standards for protecting life demanded by the most modern building codes,” the release says.
“With more than 30,000 engineering hours invested, this new Prescient Seismic System expands upon the fundamentals of our standard Unified Truss Configuration System (UTCS) to yield a more economical and faster building solution that can withstand high seismic forces,” said Magued Eldaief, CEO, Prescient. “The ability to now design buildings up to 160 feet high, or 12 stories above 4 stories of podium in seismic locations, is an incredible opportunity for us and one that will no doubt open doors to many future projects.”
Related Stories
| Mar 30, 2012
Chicago may allow people to live in retail spaces
The Chicago City Council’s Zoning Committee approved a zoning change that will allow up to 50% of work space in low-intensity business districts to be used for living space.
| Mar 30, 2012
LEED growing fast in the housing rental market
Last year, developers of 23,000 U.S. multifamily housing units applied for LEED certification.
| Mar 30, 2012
Forest Stewardship Council critical of proposed LEED 2012 changes
According to the Forest Stewardship Council (FSC), the third draft of LEED 2012, if approved as written, would represent a step backward from the current Certified Wood Credit.
| Mar 22, 2012
Symposium on water efficiency: How much more water can be saved?
The Third International Emerging Technology Symposium by IAPMO and the World Plumbing Council features a session on water efficiency.
| Mar 22, 2012
Broker doesn’t have to inform contractor that insurer went broke, California court rules
A California appellate court ruled that an insurance broker did not have a duty to inform a subcontractor that a project’s insurer had gone bankrupt.
| Mar 22, 2012
Public agencies shouldn’t negotiate project labor agreements, says AGC official
When a public agency rather than the contractor negotiates a PLA with unions, it interferes with the right of employers and workers to reach their own agreements on working conditions and benefits, says Steve Isenhart, president of the Associated General Contractors of Washington.
| Mar 22, 2012
Proposed rule would let crane operators get licenses without prior city experience
The Bloomberg administration is considering letting operators of giant tower cranes get their license without requiring that they first run cranes as apprentices in the city for three years.
| Mar 22, 2012
Bill would reintroduce “opt-out” provision in lead paint law
The Lead Exposure Reduction Amendments Act of 2012 (S2148) would restore the "Opt-Out" provision removed from the Environmental Protection Agency's Lead Renovate, Repair and Painting (LRRP) rule in April 2010.