flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Perkins&Will to design new gateway building for the University of British Columbia

University Buildings

Perkins&Will to design new gateway building for the University of British Columbia

The building will transform the arrival experience for students, staff, and visitors.


By David Malone, Associate Editor | April 29, 2021
UBC gateway building exterior
UBC gateway building exterior

Perkins&Will, in collaboration with Schmidt Hammer Lassen, will design the new health science and research building at the entrance to the University of British Columbia’s Point Grey campus.

The 270,000-sf gateway building will co-locate the School of Nursing, the School of Kinesiology, Integrated Student Health Services, and components of UBC Health and Language Sciences. It will include a mix of spaces ranging from wet and dry labs, clinical spaces, lecture theatre and classrooms, gym and fitness facilities, and office and administrative functions.

 

UBC gateway building exterior green space

 

The building will feature clear and accessible circulation paths, inclusive washrooms and change rooms, and comfortable and inviting spaces that incorporate natural materials. A large public plaza and landscaping will invite people into the public space that flows throughout the building.

A central daylight-filled, six-story atrium with large interconnecting stairs reaching form the basement to the upper floors will encourage physical activity. The atrium’s open layout and visible central spaces will help to foster interdisciplinary collaboration. Additionally, windows on the ground floor will provide a connection to the landscaped outdoor environment.

 

UBC gateway building interior atrium

 

The project will also acknowledge the host nation’s past and current presence and serves as a catalyst and model for future Musqueam engagement on campus. The building will express commonalities between Musqueam values, culture, and learning as well as take inspiration from traditional Musqueam building materials and design.

The project is targeting LEED v4 Gold certification with the design team proposing to use exposed mass timber for the building’s structure. The project is slated for completion in 2024.

 

UBC gateway building lobby space

Related Stories

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 9, 2012

Shepley Bulfinch given IIDA Design award for Woodruff Library?

The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.

| May 8, 2012

Morgan/Harbour completes three projects at Columbia Centre

Projects completed on behalf of property owner, White Oak Realty Partners, LLC, Pearlmark Realty Partners, LLC and Angelo Gordon & Co.

| May 7, 2012

2012 BUILDING TEAM AWARDS: TD Ameritrade Park

The new stadium for the College World Series in Omaha combines big-league amenities within a traditional minor league atmosphere.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

| May 3, 2012

U of Michigan team looking to create highly efficient building envelope designs

The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.

| May 2, 2012

Building Team completes two additions at UCLA

New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.

| May 1, 2012

Construction is underway on MLK ambulatory care center in L.A.

Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.

| Apr 30, 2012

Virginia Commonwealth unveils design for Arts Institution

Institute for Contemporary Art will serve as a catalyst for exhibitions, programs, research and collaboration.

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

boombox1 - default
boombox2 -
native1 -

More In Category




Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021