flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Office renovation and addition give new life to a section of Huntsville, Ala.

Office Buildings

Office renovation and addition give new life to a section of Huntsville, Ala.

The newly opened Freedom Center, near Redstone Arsenal, includes a 10,000-sf conference center.


By John Caulfield, Senior Editor | March 2, 2017

The Freedom Center in South Huntsville, Ala., is an office complex that is seen as part of the revitalization of that part of the city. Torch Technologies, the building's anchor tenant, spearheaded the redevelopment. Image: J. Hanshaw Photography

In late January, Turner Construction completed the three-phase Freedom Center, a new office complex that is part of the revitalization of South Huntsville, Ala.

The project, designed by Matheny Goldmon Architecture + Interiors and estimated at between $10 million and $12 million, is a multi-tenant facility where its anchor, Torch Technologies, a defense contractor, now operates its corporate headquarters.

Torch’s sister company, Freedom Real Estate and Capital, cleared the path for the steel-framed Freedom Center last year by acquiring two office buildings as well as approximately 12 surrounding acres of land. The Freedom Center is positioning itself to be a hub for business close to Alabama’s Redstone Arsenal.

Torch received a $2.1 million incentive package to stay in Huntsville and redevelop these properties from the city, the state of Alabama, and the Tennessee Valley Authority, according to the Alabama Media Group’s website. It also received tax abatements and grants, and $250,000 from the state as reimbursement for capital expenditures, AIDT-provided workforce training, and the capital income tax credit.

 

 

The schematic of Freedom Center's main level shows what's been upgraded during its three-phase renovation. Image: Courtesy of Freedom Real Estate and Capital

 

The three-phase Freedom Center project included the renovation of a 40,000-sf four-story building at 4090 South Memorial Parkway, which was completed in October 2015. Phase 2 involved the construction of a one-story 12,000-sf building, which connects two existing properties developed by Freedom Real Estate and Capital. This new building features office and training spaces, as well as a 10,000-plus-sf conference center.

Phase 3 replaced the building’s HVAC system, refurbished its lobby and elevators, and replaced the roof on the four-story building a 4035 Chris Drive.

“This is a significant project for Huntsville. Companies like Freedom Real Estate are increasingly investing in the redevelopment of the area,” said Lee Holland, project executive in Turner’s Huntsville office and a native of the city. “We’re thankful to have played a small role in those efforts with the construction and renovations at the Freedom Center.”

Bill Roark, CEO of Torch Technologies & Freedom Real Estate & Capital added that the Freedom Center’s name is meant to honor  “the many military members, as well as civilians, who fight and work every day to keep our country free.”

Other Building Team members on this project included 4 Site Incorporated, PEC Structural Engineering, and SSOE Group.

New Live-Work-Shop complex moving forward

Another major project that appears to have picked up momentum in downtown Huntsville is Constellation, a $180 million live-work-shop complex that would include restaurants and retail, 150 apartments, 280,000 sf of office space, a new hotel, and two parking decks.

This project was first conceived in 2000 but got waylaid during the last recession. But developer Scott McLain, of Coldwell Commercial Real Estate and McLain Real Estate, tells al.com that he has a “firmly established and functioning partnership” for this project, which he claims is now in “full development.”

Groundbreaking for Constellation could take place in a few months, said McLain.

 

Related Stories

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Aug 11, 2010

CTBUH changes height criteria; Burj Dubai height increases, others decrease

The Council on Tall Buildings and Urban Habitat (CTBUH)—the international body that arbitrates on tall building height and determines the title of “The World’s Tallest Building”—has announced a change to its height criteria, as a reflection of recent developments with several super-tall buildings.

| Aug 11, 2010

BIG's 'folded façade' design takes first-prize in competition for China energy company headquarters

Copenhagen-based architect BIG, in collaboration with ARUP and Transsolar, was awarded first-prize in an international competition to design Shenzhen International Energy Mansion, the regional headquarters for the Shenzhen Energy Company.

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

New air-conditioning design standard allows for increased air speed to cool building interiors

Building occupants, who may soon feel cooler from increased air movement, can thank a committee of building science specialists. The committee in charge of ANSI/ASHRAE Standard 55 - Thermal Environmental Conditions for Human Occupancy—after months of study and discussion--has voted recently to allow increased air speed as an option for cooling building interiors.  In lay terms, increased air speed is the equivalent of turning up the fan.

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Free-span solar energy system installed at REM Eyewear headquarters

The first cable-suspended free-span solar energy system was completed today over the REM Eyewear headquarters parking lot in Sun Valley, Calif. The patented, cable-supported photovoltaic system created by P4P Energy is expected to generate 40,877 kilowatt-hours of renewable electricity per year, enough to power five to six single family homes and to prevent 1.5 million pounds of carbon from being released into the atmosphere.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021