In Flagstaff, Ariz. Northern Arizona University (NAU) has opened its new Student-Athlete High Performance Center.
Designed by DLR Group and built by CORE Construction, the $46 million, 72,000-square-foot training center significantly increases the academic, weight training, recovery, and nutrition space available to Lumberjack student athletes. The facility sits on a hillside with views of Humphreys Peak, the highest point in Arizona.
To enter the building, visitors cross a 140-foot walking bridge that begins at the base of the tree line and elevates 20 feet before reaching the entry. This design choice allowed DLR Group to leave the site as untouched as possible.
“The iconic Parsons Family Auditorium undeniably features one of the best views of any training facility in the country, sitting above the tree line with a 60’ by 40’ glass wall that frames unobstructed views of the 12,600-foot Humphreys Peak and the San Francisco Range,” Andrew Kelly, sports design leader, DLR Group, said in a statement.
Other features include the country’s largest high-altitude training chamber on a college campus. It can simulate atmospheric conditions ranging from sea level to 12,000 feet, allowing student athletes to train at higher elevations and recover faster at sea level.
The Scott and Franci Free Academic Center—which increases dedicated academic space from 700 square feet to more than 7,000 square feet—offers individual study areas, three classrooms, a computer lab, and academic staff offices.
The Jennifer Marie Wilson Strength and Conditioning Center more than doubles the size of the Lumberjacks’ weight training area to 11,500 square feet. And the Michael E. Nesbitt Athletic Training Center features three hydrotherapy recovery pools.
In addition, NAU athletics programs are partnering with the University’s College of Health and Human Services to conduct research on student athletes in the Sims-Treharne Collaborative Research Lab.
On the team:
Owner and/or developer: Northern Arizona University
Design architect and architect of record: DLR Group
MEP and structural engineers: DLR Group
Civil engineer: Shephard-Wesnitzer, Inc.
Landscape architect: Norris Design
General contractor/construction manager: CORE Construction
Related Stories
Sports and Recreational Facilities | Mar 28, 2019
This will be the Western Hemisphere’s first purpose-built eSports arena
Populous is designing the facility.
Sports and Recreational Facilities | Mar 20, 2019
HKS unveils retractable-roof ballpark in Japan
The Nippon-Ham Fighters Baseball Club will call the park home.
Sports and Recreational Facilities | Feb 25, 2019
D.C.’s new 3-in-1 entertainment and sports arena
Rossetti and Michael Marshall Design designed the venue.
Sports and Recreational Facilities | Feb 18, 2019
New multipurpose arena in Munich will be topped with a green roof
3XN Architects is designing the project.
Sports and Recreational Facilities | Feb 6, 2019
New ice-skating facility in southern California built to endure seismic events
Great Ice Park and FivePoint Arena include four ice rinks.
Sports and Recreational Facilities | Dec 17, 2018
Qatar unveils Lusail Stadium for 2022 FIFA World Cup
The stadium will be at the center of an entirely new city.
Sports and Recreational Facilities | Dec 6, 2018
Rec centers proliferate as community hubs
Taxpayers and other investors accept the economic and social value in these complexes.
Sports and Recreational Facilities | Dec 4, 2018
Oakland A’s unveil plans to build Bjarke Ingels-designed urban ballpark
The team will also redevelop the Coliseum site.
Sports and Recreational Facilities | Oct 30, 2018
Florida’s tallest building could begin construction next spring
SkyRise Miami to offer some hair-raising attractions.
Giants 400 | Oct 12, 2018
Sports venues reach outside their walls
Professional and collegiate facilities invite fans to engage with the community.