flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Northern Arizona University opens a new training center for its student athletes

Sports and Recreational Facilities

Northern Arizona University opens a new training center for its student athletes

In addition to its various athletic and academic spaces, the center offers “one of the best views of any training facility in the country.”


By Novid Parsi, Contributing Editor | May 19, 2022
NAU Student Athlete training facility ext 1
Courtesy NAU.

In Flagstaff, Ariz. Northern Arizona University (NAU) has opened its new Student-Athlete High Performance Center. 

Designed by DLR Group and built by CORE Construction, the $46 million, 72,000-square-foot training center significantly increases the academic, weight training, recovery, and nutrition space available to Lumberjack student athletes. The facility sits on a hillside with views of Humphreys Peak, the highest point in Arizona.

To enter the building, visitors cross a 140-foot walking bridge that begins at the base of the tree line and elevates 20 feet before reaching the entry. This design choice allowed DLR Group to leave the site as untouched as possible.

“The iconic Parsons Family Auditorium undeniably features one of the best views of any training facility in the country, sitting above the tree line with a 60’ by 40’ glass wall that frames unobstructed views of the 12,600-foot Humphreys Peak and the San Francisco Range,” Andrew Kelly, sports design leader, DLR Group, said in a statement.

Other features include the country’s largest high-altitude training chamber on a college campus. It can simulate atmospheric conditions ranging from sea level to 12,000 feet, allowing student athletes to train at higher elevations and recover faster at sea level. 

The Scott and Franci Free Academic Center—which increases dedicated academic space from 700 square feet to more than 7,000 square feet—offers individual study areas, three classrooms, a computer lab, and academic staff offices. 

The Jennifer Marie Wilson Strength and Conditioning Center more than doubles the size of the Lumberjacks’ weight training area to 11,500 square feet. And the Michael E. Nesbitt Athletic Training Center features three hydrotherapy recovery pools. 

In addition, NAU athletics programs are partnering with the University’s College of Health and Human Services to conduct research on student athletes in the Sims-Treharne Collaborative Research Lab.

On the team: 
Owner and/or developer: Northern Arizona University
Design architect and architect of record: DLR Group
MEP  and structural engineers: DLR Group 
Civil engineer: Shephard-Wesnitzer, Inc.
Landscape architect: Norris Design
General contractor/construction manager: CORE Construction

NAU training center int
Courtesy NAU.
NAU training facility field
Courtesy NAU.
NAU training facility int 2
Courtesy NAU.

 

Related Stories

Sports and Recreational Facilities | Aug 9, 2018

Populous-designed Buffalo Bills training center expansion will begin construction this fall

Arc Building Partners will lead construction efforts on the project.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Building Team Awards | May 16, 2018

Game, set, match: United States Tennis Association National Campus

Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.

Sports and Recreational Facilities | May 15, 2018

Is this the most environmentally sustainable arena in the country?

The university arena was designed by Architectural Resources Cambridge.

Sports and Recreational Facilities | Apr 19, 2018

Watch a time-lapse of Wrigley Field’s most recent phase of renovations

The renovations took place between October 2017 and April 2018.

Sports and Recreational Facilities | Apr 3, 2018

Westminster College’s new athletic stadium includes a turf field and seating for 2,000

The project is the largest capital improvement project on the campus in over a decade.

Sports and Recreational Facilities | Mar 30, 2018

Final Four excitement? Here are two collegiate sports facilities to check out before your weekend of hoops

CannonDesign recently shared new images of two collegiate sports projects with interesting ties to college basketball past, present and future.

Sports and Recreational Facilities | Feb 23, 2018

A gym’s exercise equipment helps power an arts and sciences center in Rochester, N.Y.

The equipment’s supplier is eyeing the U.S. for aggressive growth.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021