flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New York should forget about surge barriers for most cost-effective resiliency plan, say researchers

Smart Buildings

New York should forget about surge barriers for most cost-effective resiliency plan, say researchers

Massive barriers too expensive; city should focus on protecting infrastructure


By BD+C Staff | May 19, 2014
Photo: New York National Guard via Wikimedia Commons
Photo: New York National Guard via Wikimedia Commons

Massive storm surge barriers would be too costly for the potential benefit to protect New York City from violent storms like Hurricane Sandy, researchers say.

U.S. and Netherlands-based researchers ran 549 simulations of storm surges of varying intensity for a cost-benefit analysis of different approaches for New York to defend itself against flooding including the construction of massive surge barriers in lower New York Bay and Long Island Sound.

While the barriers would have a positive impact, the more cost-effective option is to allow floodwaters to surge into the city while protecting critical infrastructure near sea level, such as airports, the researchers concluded. The study was published in the May 2 issue of Science.

The most cost-effective scenario had no surge barriers are at the outer limits of the city.

Rather, building codes would be made tougher for low-lying parts of New York and New Jersey, and there would be a focus on protection of critical infrastructure and “moderate enhancement protection” along parts of the Manhattan and Brooklyn waterfronts.

This plan would cost $10 to $12 billion and, the report suggests, could be paid for through a tourist “resilience fee.”

(http://www.businessweek.com/articles/2014-05-12/what-happened-when-549-imaginary-storms-hit-new-york/)

Related Stories

Resiliency | Jan 29, 2016

Section of New Orleans will try new approach to flood control

The city will turn to a retain and control storm water strategy.

BIM and Information Technology | Jan 27, 2016

Seeing double: Dassault Systèmes creating Virtual Singapore that mirrors the real world

The virtual city will be used to help predict the outcomes of and possible issues with various scenarios.

Smart Buildings | Dec 15, 2015

Property owners and developers challenge FEMA floodplain maps

Agency said to be open to revision requests.

Smart Buildings | Dec 7, 2015

AIA Baltimore holds rowhouse redesign competition

Teams competed to provide the best social and environmental design solutions for the city’s existing rowhouse stock. 

Smart Buildings | Dec 1, 2015

LEED Steering Committee approves resiliency pilot credits

Three credits address planning, design, and survivability.

Smart Buildings | Nov 30, 2015

New neighborhoods in Hamburg, Germany resilient to flooding, carbon neutral

Mixed-use areas built on brownfields and derelict districts.

Smart Buildings | Nov 13, 2015

Miami Beach making plans to cope with rising sea levels, flooding

The city has turned to sea walls, raised streets, and pumping stations.

Smart Buildings | Nov 11, 2015

No eyes on the road: The impact of driverless vehicles

The idea that space can be repurposed by breaking dependence on the purchase, maintenance, and storage of a big machine is a great boon for the sustainable future of cities, writes SmithGroupJJR's David Varner.

Smart Buildings | Nov 9, 2015

White paper promotes incentives for improved disaster resilience

The white paper makes the case that the most cost-effective manner to achieve resilience is through a holistic and integrated set of public, private, and hybrid programs.

Smart Buildings | Nov 5, 2015

JLL names 10 emerging world cities

Mexico City, Shanghai, Istanbul, and seven other world-class cities have experienced rapid economic growth and real estate development.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021