flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New York City’s largest industrial building is nearing completion

Industrial Facilities

New York City’s largest industrial building is nearing completion

The multistory facility is arriving at a time when space remains at a premium.


By John Caulfield, Senior Editor | December 21, 2022
A rendering of the 1.3-million-sf Logistics Center in The Bronx, N.Y.
The 1.3-million-sf Bronx Logistics Center in New York City is scheduled for completion in the second quarter of 2023. Rendering credit: Turnbridge Equities

Despite a significant increase to existing building stock in 2022, the national vacancy rate for industrial space in the U.S. fell below 4 percent.

At the end of last November, there were 742.3 million sf of industrial space under construction, representing 4 percent of total existing inventory, according to Commercial Edge’s National Industrial Report, which it released on December 21. Dallas and Phoenix are the two top construction markets for this sector. And nationwide, another 684.5 million sf of industrial space are in their planning stages.

However, new construction is barely keeping up with leasing demand, as the vacancy rate in the 30 largest industrial markets tracked by Commercial Edge stood at 3.8 percent at the end of November. The Report asserts that the biggest challenge for developers is finding suitable land in port markets like California’s Inland Empire, Los Angeles, and New Jersey. But even non-port markets like Nashville and Columbus, Ohio, are experiencing extremely low vacancy rates.

The top 30 markets, through November, recorded aggregate property sales of $78.8 billion. While sales have cooled a bit nationally, the average sales price of $116 per sf in the first two months of the fourth quarter was still nearly 18 percent higher than the same period in 2021.

 

Commercial Edge's ranking of top industrial construction markets
More than 742 million sf of industrial space were under construction as of the end of November. Chart: Commercial Edge National Industrial Report.
 

A huge building for a tight New York market

With these market dynamics as a backdrop, the real estate investment and development firm Turnbridge Equities announced earlier this month the topping out of Bronx Logistics Center, the largest industrial development in New York City.

Nestled in the borough’s Hunts Point industrial area, this Class A 1.3-million-sf, multilevel complex on 14.2 acres (assembled from five properties) consists of 585,000 sf of total warehouse space with 32-ft ceiling heights and 40- by 40-ft column spacing, 730,000 sf of parking space (25 percent of which is electric-vehicle ready with charging stations), 48 loading docks, and 72 drive-in doors.

 

A drone image of the Bronx Logistics Center under construction
An aerial view of the under-construction Bronx Logistics Centers shows its access to several transportation arteries. Image: Arco Design/Build

The building’s rooftop solar panels will generate three megawatts of energy. The site includes a CSX freight railway spur, providing tenants with potential direct rail access, and is located less than two miles from the Hunts Point Food Distribution Center, which generates over $3 billion of annual economic activity.

When it’s completed in the second quarter of 2023, the Bronx Logistics Center will serve the entire New York metropolitan area and beyond. It is a five-minute drive from Manhattan’s Upper West Side, and has convenient access to Interstates 95, 87, 295, and 278.

Arco Design/Build Industrial is the designer and general contractor on this project. “We provided a high level of risk mitigation for our client by locking in construction costs prior to going through all of the design documents,” Arco states on its website. Turnbridge Equities, which owns the building, and the project’s equity partner Dune Real Estate Partners, retained JLL as the leasing agent. (As of mid December, no tenants had committed to leasing space.)

While Turnbridge didn’t release the cost of this project, The Real Deal reported that Turnbridge paid $174 million to acquire the land in 2018 and more recently secured $381 million in construction financing and debt refinancing from KKR.

Once completed, the Bronx Logistics Center’s size will exceed the 1-million-sf industrial development of Innova Property Group and Square Mile Capital Management. The borough’s industrial inventory accounts for about 17 million sf of space. The Bronx Times reports that only 1.6 percent of New York City’s industrial space is available for lease.

Related Stories

| Aug 11, 2010

BE&K Building Group, Turner, BRPH awarded Boeing 787 Dreamliner assembly plant project

A joint venture of the BE&K Building Group and Turner Construction (BE&K | Turner), with design partner BRPH, has been awarded the design-build contract for design and construction of The Boeing Company’s new 787 Dreamliner final assembly plant in North Charleston, South Carolina.

| Aug 11, 2010

Report: Most data centers are too cold

A recent study (PDF) by server and computing giants shows that data centers are wasting energy-and money-by over-cooling their servers, according to a story in The Register.

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Stimulus funding helps get NOAA project off the ground

The award-winning design for the National Oceanic and Atmospheric Administration’s (NOAA) new Southwest Fisheries Science Center (SWFSC) replacement laboratory saw its first sign of movement on Sept 15 with a groundbreaking ceremony held in La Jolla, Calif. The $102 million project is funded primarily by the American Recovery and Reinvestment Act (ARRA), resulting in a rapidly advanced construction plan for the facility.

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Steel Joist Institute announces 2009 Design Awards

The Steel Joist Institute is now accepting entries for its 2009 Design Awards. The winning entries will be announced in November 2009 and the company with the winning project in each category will be awarded a $2,000 scholarship in its name to a school of its choice for an engineering student.

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1 - default
boombox2 -
native1 -

More In Category



Data Centers

What’s next for data center design in 2024

Nuclear power, direct-to-chip liquid cooling, and data centers as learning destinations are among the emerging design trends in the data center sector, according to Scott Hays, Sector Leader, Sustainable Design, with HED. 


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021