flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A new venue for the San Diego Symphony’s outdoor performances opens this week

Cultural Facilities

A new venue for the San Diego Symphony’s outdoor performances opens this week

Rady Shell at Jacobs Park was funded almost entirely by private donors.


By John Caulfield, Senior Editor | August 2, 2021
Rady Shell at Jacobs Park in San Diego sits on nearly four downtown acres. Images: San Diego Symphony

Rady Shell at Jacobs Park in San Diego provides that city's Symphony with a stunning outdoor performance space that will be functional year-round. Images: Courtesy of San Diego Symphony

This weekend, after a 13-month COVID related delay, the Rady Shell at Jacobs Park, developed and managed by the San Diego Symphony, officially opens on 3.7 acres of the city’s downtown Embarcadero district.

The $85 million Rady Shell at Jacobs Park, designed by the project’s Lead Architect and AOR Tucker Sadler Architects, is the first permanent venue for the Symphony’s schedule of outdoor classical concerts. It aspires to be the same kind of draw as the Hollywood Bowl in Los Angeles, the nation’s only other year-round outdoor concert venue operated by an orchestra.

The park is accessible to the public for free 85% of the year, as the Symphony spent $3 million to rebuild and upgrade the adjacent basketball courts and outdoor athletic equipment at Embarcadero Marina Park South. It added 34 donor benches, which are illuminated at night and were built around the venue’s perimeter and along the promenade between the venue and the San Diego Convention Center. 

 

AN INTERNATIONAL BUILDING TEAM

The Rady Shell in San Diego has two acoustical systems

The Rady Shell is amplified by an on-stage sound system as well as a second system at each side of the stage and behind the audience.

 

With its flexible seating capacity of 10,000 within a 1.25-acre audience area, Rady Shell at Jacobs Park features walkways, open-air dining pavilions, and recreational facilities. The Shell itself showcases a 4,800-sf stage wrapped in a 33,000-sf canopy provided by Australia-based Fabritecture. U.K.-based Soundforms, with architects from Flanagan Lawrence, Expedition Engineers, and ES Global, designed the Performance Shell, expanding and adapting the concept to accommodate a large orchestra, chorus, and soloists. (The Rady Shell in San Diego is 57 ft high and 82 ft wide.) Tucker Sadler was responsible for the overall design of the venue at Jacobs Park, including backstage artist support, three professional kitchens, underground restrooms, the seating area, and the public park that offers views of San Diego Bay and the city's skyline.

The Rady Shell uses two acoustical systems designed by Salter in consultation with sound designer Shawn Murphy: an on-stage Meyer Constellation Acoustic system, and an L-Acoustics system that projects sound from six towers three on each side of the stage.  JRLX and theater consultant Schuler Shook designed the venue’s lighting, and Solotech provided the audio-visual elements. An LED lighting system developed by Horton Lees Brogdon Lighting Design illuminates the exterior canopy.

 

PHILANTHROPIC OUTPOURING

The performance space is situated in the downtown Embaradero district

The venue provides views of this city and its waterfront. Image: Sal Villanueva, Tucker Sadler Architects

 

Nearly all of the money raised to fund this project came from private donors including Qualcomm’s founder Irwin Jacobs, who proposed the idea for an outdoor concert space two decades ago, according to the San Diego Union Tribune. Rady Shell also brings the Symphony—which was founded in 1910 but in 1996 was forced to liquidate its assets under Chapter 7 of the U.S. Bankruptcy Code—full circle.

The Rady Shell at Jacobs Park is designed to host more than 100 concerts and events year-round.

Other members of this project’s Building Team include Gardiner & Theobald (project manager), Coffman Engineers (SE), and Burton Studios (landscape architect).

Related Stories

| Aug 11, 2010

CTBUH changes height criteria; Burj Dubai height increases, others decrease

The Council on Tall Buildings and Urban Habitat (CTBUH)—the international body that arbitrates on tall building height and determines the title of “The World’s Tallest Building”—has announced a change to its height criteria, as a reflection of recent developments with several super-tall buildings.

| Aug 11, 2010

JE Dunn, Balfour Beatty among country's biggest institutional building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Institutional Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Walter P Moore wins top award for Nerman Museum of Contemporary Art

With structural engineering from Walter P Moore, Nerman Museum of Contemporary Art has won the New Buildings Under $30 Million project category in the 2009 Structural Engineers Association of Kansas & Missouri (SEAKM) Awards Program.

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Bowdoin College has country's first newly constructed LEED-certified ice arena

Bowdoin College's new Sidney J. Watson Arena, dedicated January 18, 2009, has become the first newly constructed ice arena in the United States to earn coveted LEED (Leadership in Energy and Environmental Design) certification from the United States Green Building Council (USGBC).

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021