flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New Univ. of Calif. Riverside business school building will support hybrid learning

University Buildings

New Univ. of Calif. Riverside business school building will support hybrid learning

Design-build project will integrate strong indoor-outdoor connections.


By Peter Fabris, Contributing Editor | November 2, 2022
UCR Business School ext
Courtesy University of California at Riverside.

A design-build partnership of Moore Ruble Yudell and McCarthy Building Companies will collaborate on a new business school building at the University of California at Riverside. The team was selected to design the new 63,000 sf building from a design competition. The structure is a key component for the school to accommodate rapidly growing enrollment—a 58% increase since 2015.

“This is the cornerstone in our plan to grow the UCR School of Business through new faculty, increased enrollment, and additional staff, and increase our engagement with the community through building a central hub for connection between business leaders, our research faculty, and our students,” said Yuzeng Wang, Dean of the Business School.

The new building will feature two 80-seat classrooms; a 350-seat auditorium; a computer lab; a studio to record podcasts, lectures, videos, and other media; study areas; a student lounge; 20 faculty offices; 59 administrative offices including one for the dean; a faculty and staff lounge; an executive meeting room, and group meeting rooms. It will also include state-of-the-art technology for hybrid learning, allowing lecturers to deliver multi-media presentations that can be recorded and streamed.

The structure will be the first new building in the south campus district, an area expected to see future growth. It has been designed to serve as a gateway and will integrate strong indoor-outdoor connections that harmonize the project to its site, district, and greater campus. A variety of outdoor spaces for student and faculty use as well as school events have been incorporated into the design.

“While the project supports future-oriented research and teaching, it is designed to be uniquely of its place, responsive to its site, campus, climate, and diverse student population,” said Jeanne Chen, FAIA, principal with Moore Ruble Yudell. “It respects its context and history while projecting boldly into the future, to support the school’s growth and leadership as an international center of excellence in business education and research.”

The project is scheduled to be completed by the fall semester of 2024. The business school at UCR is the largest in the University of California system.

On the Building Team:
Owner and/or developer: University of California Riverside
Design architect: Moore Ruble Yudell
Architect of record: Moore Ruble Yudell
MEP engineer: AEI Affiliated Engineers
Structural engineer: Coffman Engineers
General contractor/construction manager: McCarthy Building Companies

UCR Business School Ext 2
Courtesy University of California Riverside.
UCR Business School ext 3
Courtesy University of California Riverside.
UCR Business School int
Courtesy University of California Riverside.
UCR Business School int 2
Courtesy University of California Riverside.
UCR Business School int 3
Courtesy University of California at Riverside.
Courtesy University of California at Riverside.
Courtesy University of California at Riverside.

 

Related Stories

| Mar 15, 2011

Passive Strategies for Building Healthy Schools, An AIA/CES Discovery Course

With the downturn in the economy and the crash in residential property values, school districts across the country that depend primarily on property tax revenue are struggling to make ends meet, while fulfilling the demand for classrooms and other facilities.

| Mar 11, 2011

Oregon childhood center designed at child-friendly scale

Design of the Early Childhood Center at Mt. Hood Community College in Gresham, Ore., focused on a achieving a child-friendly scale and providing outdoor learning environments.

| Feb 23, 2011

“School of Tomorrow” student design competition winners selected

The American Institute of Architecture Students (AIAS) and Kawneer Company, Inc. announced the winners of the “Schools of Tomorrow” student design competition. The Kawneer-sponsored competition, now in its fifth year, challenged students to learn about building materials, specifically architectural aluminum building products and systems in the design of a modern and creative school for students ranging from kindergarten to sixth grade. Ball State University’s Susan Butts was awarded first place and $2,500 for “Propel Elementary School.”

| Feb 15, 2011

LAUSD commissions innovative prefab prototypes for future building

The LA Unified School District, under the leadership of a new facilities director, reversed course regarding prototypes for its new schools and engaged architects to create compelling kit-of-parts schemes that are largely prefabricated.

| Feb 11, 2011

Four-story library at Salem State will hold half a million—get this—books!

Salem State University in Massachusetts broke ground on a new library and learning center in December. The new four-story library will include instructional labs, group study rooms, and a testing center. The modern, 124,000-sf design by Boston-based Shepley Bulfinch includes space for 500,000 books and study space for up to a thousand students. Sustainable features include geothermal heating and cooling, rainwater harvesting, and low-flow plumbing fixtures.

| Feb 9, 2011

Gen7 eco-friendly modular classrooms are first to be CHPS verified

The first-ever Gen7 green classrooms, installed at Bolsa Knolls Middle School in Salinas, California, have become the nation's first modular classrooms to receive Collaborative for High Performance Schools (CHPS) Verified recognition for New School Construction. They are only the second school in California to successfully complete the CHPS Verified review process.

| Jan 21, 2011

Primate research facility at Duke improves life for lemurs

Dozens of lemurs have new homes in two new facilities at the Duke Lemur Center in Raleigh, N.C. The Releasable Building connects to a 69-acre fenced forest for free-ranging lemurs, while the Semi-Releasable Building is for lemurs with limited-range privileges.

| Jan 21, 2011

Virginia community college completes LEED Silver science building

The new 60,000-sf science building at John Tyler Community College in Midlothian, Va., just earned LEED Silver, the first facility in the Commonwealth’s community college system to earn this recognition. The facility, designed by Burt Hill with Gilbane Building Co. as construction manager, houses an entire floor of laboratory classrooms, plus a new library, student lounge, and bookstore.

| Jan 20, 2011

Community college to prepare next-gen Homeland Security personnel

The College of DuPage, Glen Ellyn, Ill., began work on the Homeland Security Education Center, which will prepare future emergency personnel to tackle terrorist attacks and disasters. The $25 million, 61,100-sf building’s centerpiece will be an immersive interior street lab for urban response simulations.

boombox1 - default
boombox2 -
native1 -

More In Category


Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021