Pacific Northwest Pet ER & Specialty Center, a new 18,000 sf veterinary specialty and 24/7 emergency hospital, is currently under construction by Lorentz Bruun Construction in Vancouver, Wash.
Renovated from a former Whole Foods, the project involves demolishing the former grocery store space, framing, roughing in, and sheet rocking the 77-room hospital facility. Copper RF shielding and leaded drywall were installed in rooms housing sensitive equipment such as MRI scanners.
The project will be focused providing pets medical services including 24/7 emergency care, cardiology, oncology, interventional radiology, surgery, and internal medicine. The facility will include a large Emergency Critical Care Unit with separate canine and feline ICUs, advanced imaging modalities such as MRI and CT scan, in-house lab and testing facilities, three surgery suites, an on-site pharmacy, and a physical rehabilitation unit including hydrotherapy.
The Pacific Northwest Pet ER & Specialty Center is slated to open this summer.
Related Stories
| May 7, 2012
2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital
How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.
| May 3, 2012
2012 BUILDING TEAM AWARDS: Rush University Medical Center
This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.
| May 3, 2012
Ground broken for $94 million hospital expansion at Scripps Encinitas
New facility to more than double emergency department size, boost inpatient beds by 43%.
| May 1, 2012
Construction is underway on MLK ambulatory care center in L.A.
Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.
| Apr 27, 2012
GreenExpo365.com to offer webinars on EPA’s WaterSense Program
Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.
| Apr 25, 2012
McCarthy introduces high school students to a career in construction
High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.
| Apr 20, 2012
McCarthy completes Santa Barbara Cottage Hospital Replacement Facility
The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.
| Apr 18, 2012
Perkins+Will designs new complex for Johns Hopkins Hosptial
The Charlotte R. Bloomberg Children’s Center and the Sheikh Zayed Tower create transformative patient-centric care.
| Apr 17, 2012
Alberici receives 2012 ASA General Contractor of the Year award
Alberici has been honored by the ASA eight times in the award’s nineteen-year history--more than any other general contractor in its class.
| Apr 16, 2012
Freeland promoted to vice president at Heery International
Recently named to Building Design+Construction’s 40 Under 40 Class of 2012.