Infection control, a constant worry for hospital administrators and clinical staffs, is heightened when the hospital is undergoing a major construction project. Avoiding contamination of their facilities and medical equipment while construction work is going on—say, for a new addition or a major upgrade—can be particularly difficult when the hospital’s equipment sterilization unit is located anywhere near or in the path of the construction work.
About 18 months ago, Atlanta-based STERIS, a provider of technologies for surgical and critical care, contamination control, and infection protection, introduced Mobile Sterilization Solutions, a mobile sterile-processing department that can support a hospital’s sterilization systems during construction or in the event of a disaster.
The 53-foot-long unit can be driven to the hospital site on a tractor trailer and dropped off. Fully deployed, the unit expands to a width of about 34 feet.
Its V-PRO 1 low-temperature sterilization system is set up to process large volumes of heat- and moisture-sensitive devices. Its AMSCO 400 Series medium-steam sterilizer can sterilize heat- and moisture-stable materials in packs up to 25 pounds and still meet current compliance guidelines.
The mobile unit uses CS-iQ sterile processing workflow management software, which can manage documents and records electronically and provide status reports on equipment-monitoring results and daily maintenance notifications.
Steris’s Chris Antonucci says four units are currently in operation. Some hospitals have deployed the units for as long as a year.
Read about more innovations from BD+C's 2014 Great Solutions Report.
Related Stories
| May 18, 2011
Major Trends in University Residence Halls
They’re not ‘dorms’ anymore. Today’s collegiate housing facilities are lively, state-of-the-art, and green—and a growing sector for Building Teams to explore.
| May 18, 2011
Former Bronx railyard redeveloped as shared education campus
Four schools find strength in numbers at the new 2,310-student Mott Haven Campus in New York City. The schools—three high schools and a K-4 elementary school—coexist on the 6.5-acre South Bronx campus, which was once a railyard.
| May 18, 2011
Eco-friendly San Antonio school combines history and sustainability
The 113,000-sf Rolling Meadows Elementary School in San Antonio is the Judson Independent School District’s first sustainable facility, with green features such as vented roofs for rainwater collection and regionally sourced materials.
| May 18, 2011
New Reform Jewish Independent school opens outside Boston
The Rashi School, one of only 17 Reform Jewish independent schools in North American and Israel, opened a new $30 million facility on a 166-acre campus shared with the Hebrew SeniorLife community on the Charles River in Dedham, Mass.
| May 18, 2011
Design diversity celebrated at Orange County club
The Orange County, Calif., firm NKDDI designed the 22,000-sf Luna Lounge & Nightclub in Pomona, Calif., to be a high-end multipurpose event space that can transition from restaurant to lounge to nightclub to music venue.
| May 18, 2011
Lab personnel find comfort in former Winchester gun factory
The former Winchester Repeating Arms Factory in New Haven, Conn., is the new home of PepsiCo’s Biology Innovation Research Laboratory.
| May 18, 2011
Addition provides new school for pre-K and special-needs kids outside Chicago
Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.
| May 18, 2011
Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside
The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.
| May 18, 2011
New center provides home to medical specialties
Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.