Infection control, a constant worry for hospital administrators and clinical staffs, is heightened when the hospital is undergoing a major construction project. Avoiding contamination of their facilities and medical equipment while construction work is going on—say, for a new addition or a major upgrade—can be particularly difficult when the hospital’s equipment sterilization unit is located anywhere near or in the path of the construction work.
About 18 months ago, Atlanta-based STERIS, a provider of technologies for surgical and critical care, contamination control, and infection protection, introduced Mobile Sterilization Solutions, a mobile sterile-processing department that can support a hospital’s sterilization systems during construction or in the event of a disaster.
The 53-foot-long unit can be driven to the hospital site on a tractor trailer and dropped off. Fully deployed, the unit expands to a width of about 34 feet.
Its V-PRO 1 low-temperature sterilization system is set up to process large volumes of heat- and moisture-sensitive devices. Its AMSCO 400 Series medium-steam sterilizer can sterilize heat- and moisture-stable materials in packs up to 25 pounds and still meet current compliance guidelines.
The mobile unit uses CS-iQ sterile processing workflow management software, which can manage documents and records electronically and provide status reports on equipment-monitoring results and daily maintenance notifications.
Steris’s Chris Antonucci says four units are currently in operation. Some hospitals have deployed the units for as long as a year.
Read about more innovations from BD+C's 2014 Great Solutions Report.
Related Stories
| May 18, 2011
Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside
The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.
| May 18, 2011
New center provides home to medical specialties
Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.
| May 18, 2011
Improvements add to Detroit convention center’s appeal
Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.
| May 18, 2011
One of Delaware’s largest high schools seeks LEED for Schools designation
The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.
| May 18, 2011
Carnegie Hall vaults into the 21st century with a $200 million renovation
Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.
| May 17, 2011
Redesigning, redefining the grocery shopping experience
The traditional 40,000- to 60,000-sf grocery store is disappearing and much of the change is happening in the city. Urban infill sites and mixed-use projects offer grocers a rare opportunity to repackage themselves into smaller, more efficient, and more convenient retail outlets. And the AEC community will have a hand in developing how these facilities will look and operate.
| May 17, 2011
Architecture billings index fell in April, hurt by tight financing for projects
The architecture billings index, a leading indicator of U.S. construction activity, fell in April, hurt by tight financing for projects. The architecture billings index fell 2.9 points last month to 47.6, a level that indicates declining demand for architecture services, according to the American Institute of Architects.
| May 17, 2011
Sustainability tops the syllabus at net-zero energy school in Texas
Texas-based firm Corgan designed the 152,200-sf Lady Bird Johnson Middle School in Irving, Texas, with the goal of creating the largest net-zero educational facility in the nation, and the first in the state. The facility is expected to use 50% less energy than a standard school.