flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New Hildreth Elementary School will feature a dedicated STEM center

Education Facilities

New Hildreth Elementary School will feature a dedicated STEM center

The project is slated for completion in 2021.


By David Malone, Associate Editor | October 21, 2019
Hildreth exterior

All renderings courtesy Arrowstreet

Shawmut Design and Construction, in partnership with Arrowstreet, NV5, and the Massachusetts School Building Authority, has broken ground on the new Hildreth Elementary School in Harvard, Mass.

The 85,200-sf school will accommodate 445 PK-5 students. The facility will include 25 core classrooms, a media center, an open-styled lobby, a cafeteria, a gymnasium, an art room, superintendent and administrative support staff offices, a state-of-the-art STEM center, and flexible learning spaces.

 

HIldreth elementary lobby area

 

Built in two phases, the first phase of construction will include the ground-up construction of the building adjacent to the existing building, while the second phase will begin with the demolition of the existing school and include outdoor site enhancements. Outdoor enhancements include two playgrounds, a sports field, an updated bus drop-off lane, clearer pick-up/drop-off zones, and 96 designated parking spaces. Stormwater mitigation measures and rooftop solar panels will also be included.

 

See Also: Covenant House New York will support the city’s homeless youth

 

The school is scheduled for completion in 2021.

 

HIldreth library

 

HIldreth Cafeteria

 

HIldreth Elementary gymnasium

Related Stories

| Aug 15, 2012

Skanska to build the Beacon High School in New York City

The Beacon High School will be located in the Hell’s Kitchen neighborhood of Manhattan.

| Aug 7, 2012

Shedding light on the arts

Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.

| Jul 25, 2012

KBE Building renovates UConn dining hall

Construction for McMahon Dining Hall will be completed in September 2012.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 1, 2012

White paper discusses benefits of diaphragm and piston flushometer valves

The white paper highlights considerations that impact which type of technology is most appropriate for various restroom environments.

boombox1 - default
boombox2 -
native1 -

More In Category




Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021