flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Mixed-use development under construction in Detroit’s central business district

Mixed-Use

Mixed-use development under construction in Detroit’s central business district

The development is being built on the former site of the Statler Hotel.


By David Malone, Associate Editor | January 16, 2018
CBD Detroit exterior rendering

Rendering courtesy of City Club Apartments

In 2005, the historic 18-floor, 800-room Statler Hotel was torn down, leaving one of the most exclusive corners in downtown Detroit vacant. Now, over a decade later, a new mixed-use development has broken ground at the corner of Washington Boulevard and Park Avenue.

City Club Apartments — Central Business District (CBD) Detroit will include approximately 288 apartments and penthouses and 13,000 sf of street level space, which will feature a pet store, a restaurant, and a gourmet market. “City Club Apartments—CBD Detroit will combine the service and amenities of a five-star hotel with engaging and connected urban apartment living,” says Jonathan Holtzman, Chairman and CEO of City Club Apartments, in a release.

The new $70 million mixed-use community will feature amenities such as movie theaters, social programming, valet parking, 24/7 concierge services, an entertainment club room with a gourmet kitchen, and wellness and exercise rooms. An indoor/outdoor pool and hot tub will connect to a private park and a dog park will also be available to residents.

 

Outdoor court yard space included in CBA DetroitRendering courtesy City Club Apartments.

 

The residential units will feature exclusively manufactured cabinetry and fixtures. Additionally, advanced and high-speed fiber technologies will be incorporated into the buildings.

20% of the apartments will be affordable. Furnished short-term rentals will also be offered. The apartments and penthouses come in four distinct finish packages and are available in studio, convertible, one-bedroom, and two-bedroom units.

The project is the first ground-up, mixed-use, conventionally financed high-rise to be built in Detroit’s central business district in 30 years. Pre-leasing will begin in summer 2018 with occupancy slated to begin in winter 2018. The Building Team includes BKV Group (architect), Damon Farber (landscape architect), and Wolverine Building Group (contractor).

Related Stories

High-rise Construction | Aug 4, 2015

Construction of Vietnam’s tallest building commences in Ho Chi Minh City

A 1,509-foot skyscraper broke ground on the banks of the Saigon River in Ho Chi Minh City, Vietnam.

High-rise Construction | Jul 29, 2015

Jerusalem to get a high-rise pyramid by Daniel Libeskind

Are pyramids making a comeback? The city of Paris recently approved a triangle-shaped building that stirred controversy from residents. Now, the city of Jerusalem gave Libeskind's pyramid tower the go-ahead.

Mixed-Use | Jul 22, 2015

Despite China's 'ghost cities,' the country continues construction boom

Cities continue to spring up in the heart of China. Designed to accommodate millions, many are still nearly empty.

High-rise Construction | Jul 13, 2015

Herzog & de Meuron’s triangle tower stirs controversy in Paris

The 590-foot glass pyramid building will include a 120-room hotel, 754,000 sf of office space, and cultural facilities.

High-rise Construction | Jul 7, 2015

Bjarke Ingels designs Frankfurt skyscraper with a surprise in the middle

Several levels in the center of the 185-meter tower are shifted outward to allow for terraces with city views.

Cultural Facilities | Jun 10, 2015

Artists turn oil tankers into architecture

Four Dutch artists propose transforming tankers into monuments with mixed-use space.

Wood | Jun 2, 2015

Michael Green Architecture designs world's tallest wood building for Paris competition

“Just as Gustave Eiffel shattered our conception of what was possible a century and a half ago, this project can push the envelope of wood innovation with France in the forefront," said architect Michael Green of the project.  

Smart Buildings | May 28, 2015

4 ways cold-climate cities can make the most of their waterfronts

Though cold-climate cities pose a unique challenge for waterfront development, with effective planning waterfront cities with freezing winter months can still take advantage of the spaces year-round.

Sponsored | Coatings | May 14, 2015

Prismatic coatings accent the new Altara Center

This multi-use campus will contain a university, sports facilities, medical center, and world-class shopping

Mixed-Use | May 10, 2015

Construction on Orlando’s massive ‘innovation hub’ is finally starting

The $1 billion Creative Village development will create a business and education hub.

boombox1 - default
boombox2 -
native1 -

More In Category


MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021