Western Nassau Water Authority features unique wall, window integration.


By Metl-Span | March 25, 2015
Metl-Span systems meet design needs in cost effective manner

One challenge required onsite bending of CFA panels for the curved portion of the facility. Photo courtesy of Metl-Span.

The combination of Metl-Span engineering and products met the challenging design demands of the new Western Nassau Water Authority administrative office building in North New Hyde Park, N.Y.

The goal from the beginning was to construct an energy efficient building with insulated metal panels and it had to be aesthetically pleasing, according to architect Charlie Lovell of Angelo Francis Corva & Associates in West Hempstead, N.Y. He was pleased with Metl-Span’s insulated metal panels.

“It’s a clean, aesthetic system and it holds the energy requirements of the building,” Lovell says. “It went together nicely.”

Approximately 7,500 square feet of Metl-Span panels, including insulated CFA and 7.2 Insul-Rib panels in Polar White, were installed by Girandola & Shutkind Construction of Bronx, N.Y. The CFA panels were insulated with a two-inch polyurethane foam core, the 7.2 Insul-Rib panels with 2-1/2 inches.

One challenge required onsite bending of CFA panels for the curved portion of the facility. The panels that required a 45-degree bend were factory notched and bent on site, while the panels with a 90-degree bend were bent in factory.

“We were relying on the shop drawings,” says Rich Shutkind of Girandola & Shutkind. “We spent a lot of time going over the drawings. Metl-Span’s engineering department was very helpful through the entire process. We were able to construct the circular dimensions they were looking for on the rounded part of the building. We bent the panels manually, in the field.”

The project also called for the horizontal installation of the 7.2 Insul-Rib panels up to 40 feet long, according to Shutkind. “That way we were able to avoid seams,” he said. “It’s a watertight system and it looks great.”

Metl-Span’s Metl-Vision Window System was designed to complement the architectural aesthetics and function of Metl-Span’s horizontal wall panels. According Shutkind, it easily integrated with the tongue and groove system of Metl-Span wall panels.

Metl-Span manufactures some of the most thermally efficient and cost-effective insulated metal wall, partition, ceiling and roof panels available today. The company is a recognized leader in the advancement of insulated panel technology and continues to shape industry standards. For more information on the complete line of Metl-Span products, call 877-585-9969 or visit www.metl-span.com.

Related Stories

Walls and Partitions | Jun 6, 2019

NanaWall Systems debuts AcoustiFOLD at the AIA Conference

The product is making its AIA debut at the trade show.

Sponsored | Walls and Partitions | Jun 12, 2018

Mindful design for better schools

East Aurora High School's new expansion included an atrium, several new classrooms, and a fine arts wing.

Walls and Partitions | Nov 9, 2017

Skullcandy HQ becomes one with the Utah mountains, thanks to operable glass walls

The environmentally friendly structure is integrated into the landscape and maximizes its striking views of the Uinta and Wasatch Mountains.

Walls and Partitions | Oct 16, 2017

Vertically folding walls save space while opening up rooms

Vista Air is available in several mounting options and cladding materials, including metal, wood, and glass.

Sponsored | Walls and Partitions | Jun 12, 2017

Deflection Bead case history: The Confluence

In multi-level buildings, the upper floors exert force upon the lower floors and can cause cracking of the drywall where the lower floor wall meets the ceiling, especially when the upper floors are subject to variable load, impact, or other unexpected forces.

Walls and Partitions | Feb 13, 2017

Paris plans for a permanent bulletproof glass wall to surround the base of the Eiffel Tower

The glass wall would replace the current metal fences that surround the structure.

Walls and Partitions | Dec 14, 2016

New wall system eliminates the need for most studs

The company, BamCore, says its new product can save money and quicken the framing process.

Interior Wall Systems | May 31, 2016

NanaWall PrivaSEE offers better sound rating than most fixed glass partitions

Frameless, operable all glass wall with no floor track is STC 36 sound rated

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Walls and Partitions | Nov 24, 2015

Gypsum Association releases guidance document on impact-resistant panels

Products are designed for high-traffic areas.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021