The Additive Manufacturing Team at Marine Corps Systems Command (MCSC) and Marines from I Marine Expeditionary Force recently teamed up at the U.S. Army Engineer Research and Development Center to 3D print a barracks.
The team used a computer-aided design model on a 10-year-old computer, concrete, and a 3D printer to create the 500-sf building. The job took 40 hours, but the Marines claim if there was a robot to do the mixing and pumping, the building could easily be created in one day. Typically, it takes 10 Marines five days to build a barracks out of wood.
See Also: Dubai plans to 3D print 25% of every new building by 2025
According to Capt. Matthew Friedell, AM project officer in MCSC’s Operations and Programs/G-3, nothing like this has been done before. “People have printed buildings and large structures, but they haven’t done it onsite and all at once. This is the first-in-the-world onsite, continuous concrete print,” Friedell said in a release.
Courtesy Marine Corps.
Not only does using a concrete printer expedite barracks construction, but it can also help keep Marines safe. “In active or simulated combat environments, we don’t want Marines out there swinging hammers and holding plywood up. Having a concrete printer that can make buildings on demand is a huge advantage for Marines operating down range,” says Friedell.
The Marine Corps is currently staffing a deliberate urgent needs statement and concept of employment for this technology. The results of the field user evaluation will inform future requirements to give the Corps a concrete construction additive manufacturing program of record.
For more information, click here.
Related Stories
Coronavirus | Apr 4, 2020
COVID-19: Architecture firms churn out protective face shields using their 3D printers
Architecture firms from coast to coast have suddenly turned into manufacturing centers for the production of protective face shields and face masks for use by healthcare workers fighting the COVID-10 pandemic.
AEC Tech | Feb 13, 2020
Exclusive research: Download the final report for BD+C's Giants 300 Technology and Innovation Study
This survey of 130 of the nation's largest architecture, engineering, and construction firms tracks the state of AEC technology adoption and innovation initiatives at the AEC Giants.
3D Printing | Dec 10, 2019
6,888-sf Dubai Municipality building is the largest 3D printed building to date
Apis Cor 3D printed the building.
3D Printing | Sep 17, 2019
Additive manufacturing goes mainstream in the industrial sector
More manufacturers now include this production process in their factories.
3D Printing | Jun 10, 2019
Thornton Tomasetti invests in 3D printing firm
XtreeE focuses on large-scale 3D-printing for the AEC industry.
3D Printing | Mar 14, 2019
Saudi Arabia just purchased the largest 3D construction printer in the world
COBOD developed the printer, dubbed the BOD2.
3D Printing | Dec 7, 2018
Additive manufacturing heads to the jobsite
Prototype mobile 3D printing shop aims to identify additive manufacturing applications for construction jobsites.
3D Printing | Aug 29, 2018
Dubai plans to 3D print 25% of every new building by 2025
The Dubai Future Foundation recently announced the Dubai 3D Printing Strategy.
Accelerate Live! | Jun 24, 2018
Watch all 19 Accelerate Live! talks on demand
BD+C’s second annual Accelerate Live! AEC innovation conference (May 10, 2018, Chicago) featured talks on AI for construction scheduling, regenerative design, the micro-buildings movement, post-occupancy evaluation, predictive visual data analytics, digital fabrication, and more. Take in all 19 talks on demand.
| Jun 11, 2018
Accelerate Live! talk: How advanced digital fabrication techniques are driving design innovation
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), SOM’s Lucas Tryggestad and Kyle Vansice present the firm’s 3D-printed building project and explore how digital fabrication is pushing design innovation.