flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Living/Learning Residence Hall breaks ground at Augustana University

University Buildings

Living/Learning Residence Hall breaks ground at Augustana University

KWK Architects designed the project.


By David Malone, Associate Editor | June 8, 2021
Augustana University Residence Hall exterior rendering

Courtesy KWK Architects

Augustana University officials have broken ground on a $50 million housing plan, which includes a construction of a new residence hall, on school's the Sioux Falls campus.

The L-shaped, three-story hall will house up to 200 students and include semi-suites with four beds and a bathroom in each unit. A community building at the front of the hall will include shared multi-purpose spaces and incorporate living and learning environments for faculty, students, and affinity groups on campus.

“We designed the new hall to be multi-functional for the entire campus community, and not just for the students living there,” said KWK Principal Paul Wuennenberg in a release. “Our design incorporates flexible classroom space that can be used for programming during the day, then utilized for community interactions in the evenings and weekends. A kitchen and lounge area in the hall further promotes community.”

The residence hall will be located on the south end of the university’s north campus near 33rd Street and Grange Avenue. KWK Architects is the lead designer for the new hall with TSP Inc. providing local architecture support, mechanical/electrical/structural engineering, and construction-phase services. Mortenson Construction is the developer/general contractor for the project, which is slated for completion in the fall of 2022.

Related Stories

University Buildings | Aug 19, 2021

School of Medicine completes on California University of Science and Medicine’s new Colton campus

The project was designed and built to address critical public health needs in an underserved region.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

University Buildings | Aug 12, 2021

Central Michigan University’s Chippewa Champions Center completes

The project was designed in partnership between Populous and GMB Architecture + Engineering.

University Buildings | Aug 6, 2021

Is air quality the next hot campus amenity?

New research shows that students want to be back on campus, but they—and their parents—are asking more of higher ed institutions.

Architects | Aug 5, 2021

Lord Aeck Sargent's post-Katerra future, with LAS President Joe Greco

After three years under the ownership of Katerra, which closed its North American operations last May, the architecture firm Lord Aeck Sargent is re-establishing itself as an independent company, with an eye toward strengthening its eight practices and regional presence in the U.S.

Contractors | Jul 23, 2021

The aggressive growth of Salas O'Brien, with CEO Darin Anderson

Engineering firm Salas O'Brien has made multiple acquisitions over the past two years to achieve its Be Local Everywhere business model. In this exclusive interview for HorizonTV, BD+C's John Caulfield sits down with the firm's Chairman and CEO, Darin Anderson, to discuss its business model.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Mass timber a big part of Western Washington University’s net-zero ambitions

Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021