flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The LINK PHX mixed-use development opens in Downtown Phoenix

Mixed-Use

The LINK PHX mixed-use development opens in Downtown Phoenix

Shepley Bulfinch designed the project.


By David Malone, Associate Editor | October 22, 2019
The Link

All images courtesy CA Residential

A new 30-story, 257-unit mixed-use building has officially opened in downtown Phoenix, marking the completion of the first phase of a three-phase project.

Studio, one-bedroom/one-bathroom, and two-bedroom/two-bathroom units ranging in size from 450 sf to 1,450 sf are available. Each unit features 9-foot ceilings, floor-to-ceiling windows, stainless steel appliances, and a full-size washer and dryer. 

 

The LINK PHX interior

 

Over 22,000 sf of amenity space is available to all residents, including a large rooftop deck that houses Arizona’s highest pool and spa, a sundeck, a lounge, grilling stations, and an outdoor fireplace. Other amenities include an indoor/outdoor fitness center with a yoga studio, a club room with a kitchen, workspaces, and an outdoor dog run. Bike storage and garage parking with spaces reserved for the public are also included.

 

See Also: New Hildreth Elementary School will feature a dedicated STEM center

 

In addition to the 257 residences, The LINK PHX includes 7,000 sf of retail space, half of which is reserved for startups, not-for-profits, and artists. When all three phases complete over the next decade, the development will include more than 600 rental residences and 21,000 sf of retail space.

CA Residential and Diamond Realty Investments developed the project. Shepley Bulfinch was the architect and Katerra was the general contractor.

Tags

Related Stories

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021