flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The largest planned logistics and business park in North America gets under way in Southern California

Industrial Facilities

The largest planned logistics and business park in North America gets under way in Southern California

The $25 billion World Logistics Center will boost the supply chain capabilities of Southern California and will serve as a distribution center for destinations across the continent.


By Novid Parsi, Contributing Editor  | March 6, 2023
$25 billion World Logistics Center Highland Fairview
Rendering courtesy Highland Fairview

Plans are under way for what’s being described as both the largest planned logistics and business park and the largest net zero logistics development in North America. Located in Moreno Valley, Calif., the $25 billion World Logistics Center aims to boost the supply chain capabilities of Southern California.

The facility, which will be constructed over seven years, will serve as a distribution center for destinations across the continent. The development also will include walkable streets, cafes, restaurants, spaces for arts and culture, breweries, and public space.

Owned by real estate developer Highland Fairview, with Stantec as the prime consultant, the World Logistics Center will contain over 40 million sf of facilities across 2,600 acres. The facility will make use of intelligent technologies to increase shipping efficiency, improve use of transportation resources, and reduce carbon emissions. Housing multiple national brands and logistics providers, the center will be able to deliver overnight to 11 Western states and within three days to any destination in the continental U.S.


RELATED: BD+C's 2022 Industrial Sector Giants Rankings:
• Top 95 Industrial Facility Architecture and AE Firms
• Top 90 Industrial Facility Engineering and EA Firms
• Top 110 Industrial Facility Contractors and CM Firms


The net zero development will have over 40 million sf of rooftop space for solar integration. It will leverage both autonomous vehicle (AV) and electric vehicle (EV) technologies, including 1,080 EV charging stations. The developer has been in discussions to acquire zero-emission semi-trucks and possibly AV shuttles for travel within the development. With onsite battery storage and microgrids, the facility is expected not to rely on the external power grid. The center also will prioritize water conservation, with an anticipated savings of 653 million of gallons of water each year.

Stantec’s project team, which will include 300 professionals, will provide civil engineering, industrial buildings architecture, geomatics, water and wastewater design, landscape architecture, urban planning, smart mobility and AV consulting, funding consulting, and energy and innovation design.

Project design is currently under way, with construction slated to start this year and to conclude in 2030.

$25 billion World Logistics Center Highland Fairview
Rendering courtesy Highland Fairview
$25 billion World Logistics Center Highland Fairview 2.png
Rendering courtesy Highland Fairview

Related Stories

Industrial Facilities | May 11, 2015

SOM-designed Manufacturing and Design Innovation Institute opens in Chicago

The new space will be a place for academia, industries, and civic bodies to collaborate.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Building Team Awards | Apr 5, 2015

UK's leading foot and mouth disease lab turns containment design inside out

A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.

Industrial Facilities | Mar 27, 2015

World’s first ‘climate positive’ data center is under construction in Sweden

Excess heat and steam from its servers and IT equipment will warm homes in a town already known for its energy efficiency.

Sponsored | Modular Building | Mar 16, 2015

Modular Space Showcase: Helping BP take command in the Gulf of Mexico

Immediate emergency response to minimize and remedy environmental damage called for temporary, modular spaces.

Codes and Standards | Mar 2, 2015

Proposed energy standard for data centers, telecom buildings open for public comment

The intent of ASHRAE Standard 90.4P is to create a performance-based approach that would be more flexible and accommodating of innovative change.

Industrial Facilities | Feb 27, 2015

Massive windmill will double as mixed-use entertainment tower in Rotterdam

The 571-foot structure will house apartments, a hotel, restaurants, even a roller coaster.

Cultural Facilities | Feb 25, 2015

Bjarke Ingels designs geodesic dome for energy production, community use

A new building in Uppsala, Sweden, will serve as a power plant during the winter and a venue for shows, festivals, and music events during the warm months.

Industrial Facilities | Feb 24, 2015

Starchitecture meets agriculture: OMA unveils design for Kentucky community farming facility

The $460 million Food Port project will define a new model for the relationship between consumer and producer.

boombox1 - default
boombox2 -
native1 -

More In Category




Data Centers

What’s next for data center design in 2024

Nuclear power, direct-to-chip liquid cooling, and data centers as learning destinations are among the emerging design trends in the data center sector, according to Scott Hays, Sector Leader, Sustainable Design, with HED. 

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021