flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

LA Clippers unveil $1.8 billion Intuit Dome

Arenas

LA Clippers unveil $1.8 billion Intuit Dome

AECOM is the lead designer for the project.


By David Malone, Managing Editor | September 20, 2021
LA Clippers Intuit Dome aerial rendering
Renderings courtesy Los Angeles Clippers

Intuit Dome, the future home of the Los Angeles Clippers, has broken ground in Inglewood, Calif. adjacent to the recently completed SoFi Stadium. The project’s goal is to create a technologically advanced arena, entertainment venue, and outdoor plaza that will deliver a uniquely intimate and intense experience.

The project, which will hold approximately 18,000 people, is designed for optimal and intimate engagement with the community and fans. The facility will feature a visually dynamic and structurally efficient silhouette that will be defined by a steel frame with diagrid geometry, inspired by the form of a basketball net as a ball passes through it.

Intuit Dome interior

Intuit Dome will take advantage of the Southern California climate via an indoor-outdoor approach that will allow for a naturally ventilated entrance and upper concourse. A solar-optimized building shell will balance natural light and solar heat gain.

SEE ALSO: The rise of entertainment districts and the inside-out stadium

In addition to AECOM, the core design team includes Anderson Barker Architects, Hood Design Studio, City Design Studio, Walter P. Moore, Henderson Engineering, and Labib Funk & Associates. Intuit Dome is slated to open for the 2024-2025 NBA season.

Intuit Dome at half court

Intuit Dome outdoor plaza

Intuit Dome interior practice court

Related Stories

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 13, 2014

Do you really 'always turn right'?

The first visitor center we designed was the Ernest F. Coe Visitor Center for the Everglades National Park in 1993. I remember it well for a variety of reasons, not the least of which was the ongoing dialogue we had with our retail consultant. He insisted that the gift shop be located on the right as one exited the visitor center because people “always turn right.” 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

| Mar 5, 2014

5 tile design trends for 2014

Beveled, geometric, and high-tech patterns are among the hot ceramic tile trends, say tile design experts.

| Feb 26, 2014

Billie Jean King National Tennis Center serving up three-phase expansion

The project includes the construction of two new stadiums and a retractable roof over the existing Arthur Ashe Stadium. 

| Feb 14, 2014

First look: Kentucky's Rupp Arena to get re-clad as part of $310M makeover

Rupp Arena will get a 40-foot high glass façade and a new concourse, but will retain many of its iconic design elements.

| Jan 28, 2014

16 awe-inspiring interior designs from around the world [slideshow]

The International Interior Design Association released the winners of its 4th Annual Global Excellence Awards. Here's a recap of the winning projects.

| Jan 13, 2014

Custom exterior fabricator A. Zahner unveils free façade design software for architects

The web-based tool uses the company's factory floor like "a massive rapid prototype machine,” allowing designers to manipulate designs on the fly based on cost and other factors, according to CEO/President Bill Zahner.

| Jan 11, 2014

Getting to net-zero energy with brick masonry construction [AIA course]

When targeting net-zero energy performance, AEC professionals are advised to tackle energy demand first. This AIA course covers brick masonry's role in reducing energy consumption in buildings. 

| Dec 31, 2013

Top 10 blog posts from 2013

BD+C editors and our contributors posted hundreds of blogs in 2013. Here's a recap of the most popular topics. They include valuable lessons from one of the first BIM-related lawsuits and sage advice from AEC legend Arthur Gensler.  

boombox1 - default
boombox2 -
native1 -

More In Category




Giants 400

Top 70 Sports Facility Construction Firms for 2023

AECOM, Turner Construction, Clark Group, Mortenson head BD+C's ranking of the nation's largest sports facility contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021