flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

KPF’s first hybrid mass timber project set to rise in Vancouver

Mass Timber

KPF’s first hybrid mass timber project set to rise in Vancouver

The project will be built in the Bentall Centre campus.


By David Malone, Managing Editor | October 5, 2021
Burrard Exchange exterior
Renderings courtesy KPF

Hudson Pacific Properties has recently unveiled a proposed addition to Vancouver’s Bentall Centre. The project, dubbed Burrard Exchange at Bentall Centre, will be a 16-story hybrid mass timber office and retail development. The building represents Kohn Pedersen Fox Associates’ (KPF) first mass timber project.

Under the proposed plans, the 450,000-sf project would become one of the tallest exposed mass timber office buildings in North America. Burrard Exchange’s design prioritizes both indoor and outdoor spaces to enhance connections to nature from within the building and meet growing demand for high-function outdoor areas and fresh air access. The development will create new street frontages, amenities, and retail space to service the entire campus and public.

Burrard Exchange interior

Burrard Exchange will feature approximately 30,000-sf floor plates and natural interior finishes unique to mass timber construction with 14.5-foot floor-to-floor heights that allow for more natural light. Terraces and loggias will be featured on half of Burrard Exchange’s 16 floors, totaling 21,000 sf. A rooftop deck with a conference area, meeting spaces, and outdoor seating will be included and for exclusive use of building tenants.

Burrard Exchange interior with natural light

An at-grade pavilion will unite the new 20,000-sf plaza to create one of the largest outdoor gathering spaces in downtown. A lobby connection to the below-grade Shops at Bentall Centre will also be included.

In addition to KPF, Adamson Associates Architects is the architect of record. Upon completion, building operations will be 100% carbon neutral. The project is expected to create more than 2,000 direct and indirect jobs, with construction set to begin as early as 2023.

Related Stories

Mass Timber | Jan 27, 2023

How to set up your next mass timber construction project for success

XL Construction co-founder Dave Beck shares important preconstruction steps for designing and building mass timber buildings.

Mass Timber | Dec 1, 2022

Cross laminated timber market forecast to more than triple by end of decade

Cross laminated timber (CLT) is gaining acceptance as an eco-friendly building material, a trend that will propel its growth through the end of the 2020s. The CLT market is projected to more than triple from $1.11 billion in 2021 to $3.72 billion by 2030, according to a report from Polaris Market Research.

| Sep 13, 2022

California building codes now allow high-rise mass-timber buildings

California recently enacted new building codes that allow for high-rise mass-timber buildings to be constructed in the state.

Mass Timber | Aug 30, 2022

Mass timber construction in 2022: From fringe to mainstream

Two Timberlab executives discuss the market for mass timber construction and their company's marketing and manufacturing strategies. Sam Dicke, Business Development Manager, and Erica Spiritos, Director of Preconstruction, Timberlab, speak with BD+C's John Caulfield. 

| Aug 8, 2022

Mass timber and net zero design for higher education and lab buildings

When sourced from sustainably managed forests, the use of wood as a replacement for concrete and steel on larger scale construction projects has myriad economic and environmental benefits that have been thoroughly outlined in everything from academic journals to the pages of Newsweek.

Mass Timber | Jun 29, 2022

Mass timber competition: building to net-zero winning proposals

The 2022 Mass Timber Competition: Building to Net-Zero is a design competition to expand the use of mass timber in the United States by demonstrating its versatility across building types and its ability to reduce the carbon footprint of the built environment.

Mass Timber | Jun 2, 2022

Brooklyn is home to New York City’s first mass timber condo building

In the Brooklyn neighborhood of Park Slope, the newly completed Timber House is New York City’s first mass timber condominium building and its largest mass timber project (by height and square footage). 

Mass Timber | May 31, 2022

Tall mass timber buildings number 139 worldwide

An audit of tall mass timber buildings turned up 139 such structures around the world either complete, under construction, or proposed.

Mass Timber | Mar 8, 2022

Heavy timber office and boutique residential building breaks ground in Austin

T3 Eastside, a heavy timber office and boutique residential building, recently broke ground in Austin, Texas.

Mass Timber | Jan 11, 2022

As trends shift toward mass timber, AEC firms are watching the demand curve

Swinerton’s New York office expects its first projects to be luxury residential.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.


Libraries

New mass timber Teddy Roosevelt library aims to be one with nature

On July 4, 2026, the Theodore Roosevelt Presidential Library is scheduled to open on 93 acres in Medora, a town in North Dakota with under 130 permanent residents, but which nonetheless has become synonymous with the 26th President of the United States, who lived there for several years in the 1880s.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021