flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

KLH Engineers flaunts its innovation with latest spinoff

Engineers

KLH Engineers flaunts its innovation with latest spinoff

Configure platform brings suppliers, designers, and contractors closer during the purchasing process.


By John Caulfield, Senior Editor | June 2, 2022
Configure is the latest spinoff from KLH Engineers
Configure is the latest spinoff from KLH Engineers. It is a platform that makes specifying smoother by linking AEC firms with manufacturers. Leaders from Configure and KLH Engineers (from left): Jeff Leuderalbert and Michael Albanese, cofounders of Configure, with Jim Tavernelli and Bob Heil, KLH Engineers’ President and CEO. Image: KLH Engineers

About 15 months ago, KLH Engineers, a national MEP and technology engineering firm based in Kentucky, spun off Levcon Analytics, which uses data to provide AEC firms with design, construction, and operations advice. By uniting design and building teams, Levcon’s Convergit data integration platform also improves a building owner’s asset management and project execution.

Late last month, KLH spun off another entity. Known as Configure, the now-separate business has been developing a construction marketplace that digitizes supply and makes it easier for designers and contractors to specify, compare, and purchase engineered-to-order products from manufacturers. Configure’s platform is accessible through web apps or Autodesk Revit plug-ins.

PRICING PRODUCTS, MADE SIMPLER

Its conception was born out of the frustration of trying to specify equipment with pricing information being immediately at hand, explains Michael Albanese, a principal with KLH Engineers who, with principal Jeff Leuderalbert, came up with Configure and developed its platform.

Leuderalbert elaborates that during a project’s design phase, suppliers communicate with potential customers within their Revit models, and designers can link products, product data and pricing directly into their models. During pre-construction, Configure matches contractors with local suppliers so they can solicit and compare bids in one platform, and select the package that best fits their project and budget.

Some of Configure’s early customers include Tweet/Garot Mechanical, Green Bay, Wis.; Silicon Valley Mechanical, San Jose, Calif.; and Peck Hannaford + Briggs, Cincinnati, Ohio. 

SUPPORTERS FROM INSIDE AND OUT

During Configure’s early development, KLH allowed Albanese and Leuderalbert to leverage the firm’s in-house software team to build their platform. Configure has raised $2 million in a seed round led by TitletownTech, a Wisconsin-based venture capital fund formed out of a partnership between the Green Bay Packers and Microsoft. Configure will deploy its new capital to expand its software technology and make additional product development hires.

These spinoffs demonstrate KLH’s innovation beyond engineering consultation, says Tavernelli, who implies there might be more to come. “We learned so much throughout this journey and KLH will leverage that experience to continue seeking ways to create new value in the industry.”

Tags

Related Stories

| Nov 16, 2010

Calculating office building performance? Yep, there’s an app for that

123 Zero build is a free tool for calculating the performance of a market-ready carbon-neutral office building design. The app estimates the discounted payback for constructing a zero emissions office building in any U.S. location, including the investment needed for photovoltaics to offset annual carbon emissions, payback calculations, estimated first costs for a highly energy efficient building, photovoltaic costs, discount rates, and user-specified fuel escalation rates.

| Nov 16, 2010

CityCenter’s new Harmon Hotel targeted for demolition

MGM Resorts officials want to demolish the unopened 27-story Harmon Hotel—one of the main components of its brand new $8.5 billion CityCenter development in Las Vegas. In 2008, inspectors found structural work on the Harmon didn’t match building plans submitted to the county, with construction issues focused on improperly placed steel reinforcing bar. In January 2009, MGM scrapped the building’s 200 condo units on the upper floors and stopped the tower at 27 stories, focusing on the Harmon having just 400 hotel rooms. With the Lord Norman Foster-designed building mired in litigation, construction has since been halted on the interior, and the blue-glass tower is essentially a 27-story empty shell.

| Nov 16, 2010

Where can your firm beat the recession? Try any of these 10 places

Wondering where condos and rental apartments will be needed? Where companies are looking to rent office space? Where people will need hotel rooms, retail stores, and restaurants? Newsweek compiled a list of the 10 American cities best situated for economic recovery. The cities fall into three basic groups: Texas, the New Silicon Valleys, and the Heartland Honeys. Welcome to the recovery.

| Nov 16, 2010

Landscape architecture challenges Andrés Duany’s Congress for New Urbanism

Andrés Duany, founder of the Congress for the New Urbanism, adopted the ideas, vision,  and values of the early 20th Century landscape architects/planners John Nolen and Frederick Law Olmsted, Jr., to launch a movement that led to more than 300 new towns, regional plans, and community revitalization project commissions for his firm. However, now that there’s a societal buyer’s remorse about New Urbanism, Duany is coming up against a movement that sees landscape architecture—not architecture—as the design medium more capable of organizing the city and enhancing the urban experience.

| Nov 16, 2010

NFRC approves technical procedures for attachment product ratings

The NFRC Board of Directors has approved technical procedures for the development of U-factor, solar heat gain coefficient (SHGC), and visible transmittance (VT) ratings for co-planar interior and exterior attachment products. The new procedures, approved by unanimous voice vote last week at NFRC’s Fall Membership Meeting in San Francisco, will add co-planar attachments such as blinds and shades to the group’s existing portfolio of windows, doors, skylights, curtain walls, and window film.

| Nov 15, 2010

Gilbane to acquire W.G. Mills, Inc.

Rhode Island-based Gilbane Building Company announced plans to acquire W.G. Mills, Inc., a construction management firm with operations based in Florida. The acquisition will dramatically strengthen Gilbane’s position in Florida’s growing market and complement its already established presence in the southeast.

| Nov 11, 2010

Saint-Gobain to make $80 million investment in SAGE Electrochromics

Saint-Gobain, one of the world’s largest glass and construction material manufacturers, is making a strategic equity investment in SAGE Electrochromics to make electronically tintable “dynamic glass” an affordable, mass-market product, ushering in a new era of energy-saving buildings.

| Nov 11, 2010

Saint-Gobain to make $80 million investment in SAGE Electrochromics

Saint-Gobain, one of the world’s largest glass and construction material manufacturers, is making a strategic equity investment in SAGE Electrochromics to make electronically tintable “dynamic glass” an affordable, mass-market product, ushering in a new era of energy-saving buildings.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Mass timber a big part of Western Washington University’s net-zero ambitions

Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021