flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Katerra has plans for a new advanced manufacturing factory in California

Building Automation

Katerra has plans for a new advanced manufacturing factory in California

The building components facility will be located near rail, shipping ports, and freeways.


By David Malone, Associate Editor | July 13, 2018
Automated robot arm
Automated robot arm

Katerra, a construction technology company, recently revealed plans to build an advanced manufacturing factory in California’s Central Valley. The Tracy, Calif., facility will produce building components such as wall panels, floor systems, roof truss assemblies, windows, cabinets, and finishes.

The 577,000-sf, factory will complement Katerra’s existing California operations, including its headquarters in Menlo Park and office in San Francisco. The new facility will differ from Katerra’s first, located in Phoenix, Ariz., by including significantly more automation, including fully automated wood frame wall production lines, automated floor lines, automated cabinet and finish areas, automated roof truss lines, an automated window line, and a light gauge steel production line.

 

See Also: Katerra, a tech-driven GC, plots ambitious expansion

 

The new facility will be located near rail, shipping ports, and freeways and create more than 500 jobs for the area. Production is slated to begin in 2019. Katerra is also in the process of building a mass timber manufacturing facility in Spokane, Wash., that will produce cross-laminated timber wall panels and floor systems when it becomes operational in 2019.

 

Related Stories

| Jul 21, 2011

Bringing BIM to the field

A new tablet device for construction professionals puts 3D data at the fingertips of project managers and construction supervisors.

| Nov 2, 2010

11 Tips for Breathing New Life into Old Office Spaces

A slowdown in new construction has firms focusing on office reconstruction and interior renovations. Three experts from Hixson Architecture Engineering Interiors offer 11 tips for office renovation success. Tip #1: Check the landscaping.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Community center under way in NYC seeks LEED Platinum

A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.

boombox1 - default
boombox2 -
native1 -

More In Category

AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021