flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

On its Golden anniversary, Parish Episcopal School in Dallas adds a performing arts center

Performing Arts Centers

On its Golden anniversary, Parish Episcopal School in Dallas adds a performing arts center

The new building’s design blends in with the campus’ existing structures.


By John Caulfield, Senior Editor | September 28, 2021
The new Performing Arts Center at Parish Episcopal School
The Noble Family Performing Arts Center is the latest addition to Parish Episcopal, a private school with 1,200 students. Images: Courtesy of McCarthy Building Companies

A project team that included the designer BOKA Powell and general contractor McCarthy Building Companies recently completed the 55,000-sf Noble Family Performing Arts Center on the Midway campus of Parish Episcopal School in North Dallas.

That same team was involved in another of this school’s expansions, the 24,000-sf Gene E. Phillips Activity Center, which opened for the 2017-2018 school year.

The private Parish Episcopal School celebrates its 50th anniversary this year. Since 2002 it has owned and operated out of what once was ExxonMobil’s Pei Cobb Freed-designed corporate headquarters. The school currently has about 1,200 Pre-K through 12th-grade students and 150 faculty. Its new Performing Arts Center “will play a pivotal role as we celebrate our history and launch a future of limitless possibilities for our students,” said Dave Monaco, Allen Meyer Family Head of School, in a prepared statement.

DESIGN CONTINUITY

The new facility consists of various spaces that include a 515-seat performance hall whose chamber is more than 50 ft tall. A Black Box theater has an audience capacity of 120. The facility features a music hall, rehearsal rooms, and a film screening room. The back-of-house spaces include a scene shop, dressing rooms with a tailoring shop, storage areas, offices, and a storm shelter. A Gallery Space displays works by students and visiting artists.

Parish Episcopal School engaged BOKA Powell—which provided architecture and interior design services—to envision a new building in keeping with the campus’ existing style. During construction, which began in November 2019, McCarthy deployed BIM models, laser scans of the slab, and aerial images, according to the firm’s region president Joe Jourvenal.

The Performing Arts Center connects to existing buildings and incorporates many of the same materials. Pre-cast concrete panels are arranged in a rhythmic pattern to capture the sunlight in a theatrical manner as a reinterpretation of the dramatic north light of the existing Great Hall vault. A grand entrance welcomes guests into a naturally lit lobby.

The addition used many of the same materials as the original building
Precast exterior walls were designed to match the architecture of the school's existing buildings.
 

The completed project has optimized acoustics and a control room with the latest light and sound equipment.

The performing arts center is named in honor of the three children of Natalie and Scott Noble, who invested $3.7 million in the school’s “Limitless” fundraising campaign.

Click here for a short virtual tour of the new building.

Related Stories

| Nov 15, 2013

Metal makes its mark on interior spaces

Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Oct 30, 2013

15 stellar historic preservation, adaptive reuse, and renovation projects

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 28, 2013

Urban growth doesn’t have to destroy nature—it can work with it

Our collective desire to live in cities has never been stronger. According to the World Health Organization, 60% of the world’s population will live in a city by 2030. As urban populations swell, what people demand from their cities is evolving.

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

| Sep 24, 2013

8 grand green roofs (and walls)

A dramatic interior green wall at Drexel University and a massive, 4.4-acre vegetated roof at the Kauffman Performing Arts Center in Kansas City are among the projects honored in the 2013 Green Roof and Wall Awards of Excellence. 

| Sep 19, 2013

What we can learn from the world’s greenest buildings

Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.

| Sep 19, 2013

6 emerging energy-management glazing technologies

Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level. 

| Sep 19, 2013

Roof renovation tips: Making the choice between overlayment and tear-off

When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.

boombox1 - default
boombox2 -
native1 -

More In Category



Performing Arts Centers

Frank Gehry-designed expansion of the Colburn School performing arts center set to break ground

In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.


Giants 400

Top 35 Performing Arts Center and Concert Venue Construction Firms for 2023

The Whiting-Turner Contracting Company, Holder Construction, McCarthy Holdings, Clark Group, and Gilbane Building Company top BD+C's ranking of the nation's largest performing arts center and concert venue general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021