flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

It only took 26 days to complete construction on the Crowne Plaza Changi Airport hotel extension

Hotel Facilities

It only took 26 days to complete construction on the Crowne Plaza Changi Airport hotel extension

PPVC techniques allowed the project to save time and manpower.


By David Malone, Associate Editor | July 5, 2017

Photo: Patrick Bingham-Hall

The Singapore Changi Airport is, according to the most recent numbers from the Airports Council International, the 17th busiest airport in the world by passenger traffic. With so many people passing through on a daily basis, it was important for the new addition to the Crowne Plaza Changi Airport hotel to be built in as little time as possible.

The new building was Singapore’s first private sector commercial project to use pre-fabricated, pre-finished volumetric construction (PPVC), which led to the addition being built in just 26 days. WOHA designed the original 320-room hotel as well as the 243-room, 103,495-sf addition.

 

Photo: Patrick Bingham-Hall.

 

The use of the PPVC method slashed manpower requirements on site by as much as 45%, reduced overall construction time by 17%, and accomplished both of these with about 40% in manpower savings.

 

Photo: Patrick Bingham-Hall.

 

“The Crowne Plaza Changi Airport hotel extension (CPEX) demonstrates that it is possible to significantly reduce the number of workers required, shorten construction time, improve building quality and even overcome site constraints by changing the way we build,” says Singapore’s Building and Construction Authority CEO John Keung in a release.

 

Photo: Patrick Bingham-Hall.

Related Stories

Modular Building | Feb 16, 2020

On the West Coast, prefab gains ground for speedier construction

Gensler has been working with component supplier Clark Pacific on several projects.

Hotel Facilities | Feb 12, 2020

HGA-designed hotel becomes one of the tallest buildings in Rochester, Minn.

The project is part of the city’s Destination Medical Center initiative.

Hotel Facilities | Jan 28, 2020

Atari to build eight video game-themed hotels

The first location will break ground in Phoenix later this year.

Hotel Facilities | Dec 5, 2019

Disney’s Galactic Starcruiser hotel will open in 2021

The immersive hotel will be the company’s newest Star Wars experience.

Sustainability | Nov 13, 2019

Citicape House will feature Europe’s largest living wall

Sheppard Robson designed the project.

Hotel Facilities | Nov 13, 2019

A guitar-shaped hotel is South Florida’s latest beacon

The Seminole Hard Rock Hotel & Casino in Hollywood is illuminated by 2.3 million lights and lasers.

Hotel Facilities | Nov 7, 2019

New London aparthotel is made entirely from shipping containers

Doone Silver Kerr designed the project.

Resort Design | Oct 24, 2019

Ponce Paradise wants to become Puerto Rico’s premiere destination

LandDesign and Winstanley Architects & Planners are designing the project.

Hotel Facilities | Oct 22, 2019

Modular, collapsable hotel pods can be built in cities’ interstitial spaces

Connectic by Cooper Carry recently won the 2019 Radical Innovation Award.

Hotel Facilities | Sep 24, 2019

A series of glass ‘igloos’ create the world’s northernmost hotel

Luxury Action, a private travel company, is behind the project.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021