flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A housing complex outside Paris is touted as the world’s first fully recycled concrete building

Concrete Technology

A housing complex outside Paris is touted as the world’s first fully recycled concrete building

Holcim, a Swiss provider of sustainable building solutions, has developed a concrete made with recycled construction and demolition waste, recycled wastewater, and rainwater.


By Novid Parsi, Contributing Editor | April 24, 2023
Recygénie - A housing complex outside Paris is touted as the world’s first fully recycled concrete building
To build Recygénie, Holcim will use a concrete it has developed in which all components—cement, aggregates, and water—are made of recycled materials.

Outside Paris, Holcim, a Swiss-based provider of innovative and sustainable building solutions, and Seqens, a social housing provider in France, are partnering to build Recygénie—a 220-unit housing complex, including 70 social housing units. Holcim is calling the project the world’s first fully recycled concrete building. 

To build Recygénie, Holcim will use a concrete it has developed in which all components—cement, aggregates, and water—are made of recycled materials. The organization says its recycled cement has saved about 3,000 tons of natural resources that would have been extracted from quarries. Holcim’s concrete—made with recycled aggregates from construction and demolition waste, recycled wastewater, and rainwater—has saved more than 6,000 tons of natural resources. 

“We need to shift gears: from a linear take-make-waste economy to a circular one, to improve living standards for all, while staying within our planet’s limits,” Edelio Bermejo, Holcim’s head of global R&D, said in a statement.

The Recygénie project is part of a renewal program launched by the City of Gennevilliers, located in the northwest suburbs of Paris. The project will offer new and diversified housing—including both social and private housing—as part of a redevelopment of the entire district. 

After creating cement with 20% recycled construction and demolition waste in Switzerland, Holcim has been working to scale the solution across Europe. Holcim says it aims to use fully recycled concrete across all its markets, adapting the solution to local building norms and material availability. In 2022, Holcim recycled 34 million tons of materials, 7 million tons of which were construction and demolition waste—turning these materials into new building solutions and alternative fuels. 

Construction of Recygénie is underway, with completion expected by the end of 2024.

On the Building Team:
Architect: A26 BLM
Owner and developer: Seqens
Engineer: Ingea
Control bureau: Qualiconsult
General contractor: Legendre

Related Stories

| Jan 26, 2012

World of Concrete 2012: A tinge of optimism

Cement consumption is expected to increase significantly in 2013, the first time an increase has been predicted in the past five years.

| Jan 8, 2012

TCA releases The Construction of Tilt-Up

The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up

| Jan 4, 2012

HDR to design North America’s first fully digital hospital

Humber River  is the first hospital in North America to fully integrate and automate all of its processes; everything is done digitally.

| Jan 3, 2012

AIA Course: New Developments in Concrete Construction

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 14, 2011

Belfer Research Building tops out in New York

Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.

| Dec 12, 2011

CRSI design awards deadline extended to December 31

The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 10, 2011

Energy performance starts at the building envelope

Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021