In Washington D.C., a new condo building is slated to go up alongside a historic church—and incorporate the church into its design.
Sorg Architects unveiled a design scheme for 40 condos in a six-story building, which will wrap around the church. The church itself is designated a historic site. Four residential units will be built within, one for each floor. Sorg has already done extensive renovations and structural work on the church, given that it acquired the structure in 2006 and has been planning this condo building ever since. (In 2006, the firm presented a similar design to the Historic Presentation Review Board, but the project was shelved during the recession.)
Sorg presented the design for the project on Monday January 27, and it was approved by the Advisory Neighborhood Committee 1B, along with two zoning variances. However, a committee member objected to the design, comparing it to other generic-looking condo buildings in the D.C. area.
Sorg Architects principal Suman Sorg responded that the core of the complex’s design is dictated by the church, and that the finished project would likely look very different from the presented rendering.
“The materiality of this building will be very different,” said said, according to Urban Turf. “Since the basic structure is sort of prescribed, we feel we can accentuate (the architecture) with the material choices.”
The two zoning variances the firm is pursuing involve the rear setback of the building and the lot occupancy, which in the current plan is 10 percent higher than dictated.
Related Stories
Multifamily Housing | Apr 12, 2024
Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago
New 33-story Class A rental tower, designed by SCB, will offer 343 rental units.
Student Housing | Apr 12, 2024
Construction begins on Auburn University’s new first-year residence hall
The new first-year residence hall along Auburn University's Haley Concourse.
K-12 Schools | Apr 11, 2024
Eric Dinges named CEO of PBK
Eric Dinges named CEO of PBK Architects, Houston.
Construction Costs | Apr 11, 2024
Construction materials prices increase 0.4% in March 2024
Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.
Healthcare Facilities | Apr 11, 2024
The just cause in behavioral health design: Make it right
NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.
K-12 Schools | Apr 10, 2024
A San Antonio school will provide early childhood education to a traditionally under-resourced region
In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.
University Buildings | Apr 10, 2024
Columbia University to begin construction on New York City’s first all-electric academic research building
Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces.
K-12 Schools | Apr 10, 2024
Surprise, surprise: Students excel in modernized K-12 school buildings
Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction?
Industrial Facilities | Apr 9, 2024
Confessions of a cold storage architect
Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.
Cultural Facilities | Apr 8, 2024
Multipurpose sports facility will be first completed building at Obama Presidential Center
When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.