flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

High court, big impact: San Diego Central Courthouse

Building Team Awards

High court, big impact: San Diego Central Courthouse

Gold Award: San Diego’s high-rise courthouse increases access to justice for citizens by consolidating 71 court departments.


By David Barista, Editorial Director | May 15, 2018
SD Courthouse

Bruce Damonte, courtesy SOM

Rising 24 stories in the center of downtown San Diego, the San Diego Central Courthouse, with its subtractive massing and slender form, topped with a dramatic aluminum-panel crown structure, makes a bold architectural statement about the future of civic buildings in America’s Finest City.

The 704,000-sf facility, on a former brownfield site at the intersection of Union and C Streets, is designed to serve as a catalyst for an emerging government district. It consolidates 71 departments across San Diego County’s criminal trial, family, and civil courts in a 21-story tower that sprouts from a three-story podium structure.

The high-volume functions of the criminal courts—arraignment courts, misdemeanor courts, offices, jury assembly rooms, business offices, cafeteria—are located within the podium. These functions are serviced by a cascading stair and escalator along a three-story lobby, which connects with a vestibule and a raised entry plaza. A fritted glass curtain wall brings natural light into the corridor.

 

The courthouse is crowned with a distinctive canopy and soffit of shaped aluminum panels, which are arranged to capture and reflect southern and western light back onto the underside of the structure’s surface. Bruce Damonte, courtesy SOM.

 

In the tower, the plan is organized based on a module of two pairs of courtrooms with a holding core in between. Clear and separate circulation paths are provided for the public and staff.

The courthouse connects via bridge to the adjacent Hall of Justice, at the third level. The bridge is accessible by escalator from the lobby and is adjacent to the new 500-person jury assembly room, permitting members of the public who have passed through security in either building to pass between buildings, and allowing the jury assembly room to serve both buildings.

 

The high-volume functions of the criminal courts are located within the podium and are serviced by a cascading stair and escalator along a three-story lobby. Bruce Damonte, courtesy SOM.

 

Working with the client, the project team delivered on several key owner objectives, including:

— Flexible, adaptable spaces. The client desired a building that could easily adapt to meet future needs. For example, the design of the family, probate, and civil courts is identical to the criminal trial courts, with the exception of the jury box. This allows the criminal courts to be converted to family or civil courts. Also, the jury deliberation rooms are sized to be convertible to judicial chambers, and the business offices in the podium feature large open floor plans for future programmatic evolution.

— Landmark design that celebrates the skyline. While not the city’s tallest building, the courthouse is among its most distinctive high-rises, with its angular, monolithic form topped with a distinguishing canopy structure that shades its east façade. Shaped aluminum panels form the soffit for the canopy and are arranged to capture and reflect southern and western light back onto the underside of the structure’s surface. This design feature gives the courthouse a bold civic identity within the skyline and “celebrates the unique light of San Diego,” say its designers.

— Enhanced seismic design. After evaluating several structural options, the team selected a solution that was both cost effective and would meet the client’s “enhanced” seismic performance objective. The structural system consists of a cost-efficient steel-framed superstructure with two-way lateral special moment frames that incorporate 106 nonlinear viscous damping devices (VDD). The VDDs were placed along the height of the structure, from level six to the roof, with four to six VDDs at each level. The viscous dampers provide a distributed supplemental energy dissipating damping system over the height of the structure to reduce seismically induced building story shears, story drifts, floor accelerations, and inelastic rotational demands on moment frame beam-column joints. They are also effective in providing damping for wind loads.

“The San Diego Central Courthouse increases the access to justice for citizens of San Diego County by consolidating 71 court departments,” said Clifford Ham, Judicial Council of California Administrative Office of the Courts. “The building is both noble and efficient, representing the importance of the Superior Court of California in this community and providing a safe, well-organized, technically sophisticated environment for the judicial proceedings.”

 

The project team built models and full-scale mockups to gather feedback from the judges, court staff, and secretarial user groups. Courtesy SOM.

 

 

Building Team — Submitting firm, architect, structural engineer Skidmore, Owings & Merrill Owner Judicial Council of California Administrative Office of The Courts MEP engineer WSP General contractor Rudolph and Sletten

General Information — Size 704,000 sf Construction cost $465 million Construction time December 2013 to December 2017 Delivery method Design-bid-build

 

Return to the 2018 Building Team Awards Landing Page

Related Stories

Building Team Awards | Jun 8, 2017

Narrow site, broad vision: LA Metro Light Rail Operations & Maintenance Facility

Gold Award: A slender building site had direct implications for the design of this light-rail facility.

Building Team Awards | Jun 8, 2017

Missing link: Denver International Airport and Transit Center

Gold Award: A new mixed-use transit center fulfills Denver’s 28-year plan to improve access to the nation’s fifth-busiest airport.

Building Team Awards | Jun 7, 2017

Rising above adversity: National Museum of African American History and Culture

Gold Award: The Smithsonian Institution’s newest museum is a story of historical and construction resolve.

Building Team Awards | Jun 7, 2017

Justice league: United States courthouse

Gold Award: The Building Team for L.A.’s newest courthouse went way beyond what was expected.

Building Team Awards | Jun 7, 2017

Blurring the lines: University of Chicago North Residential Commons

Gold Award: The University of Chicago’s new Residential Commons is part campus, part community.

Building Team Awards | Jun 7, 2017

Rebuilding to heal: Sandy Hook Elementary School

Gold Award: Community involvement was paramount as Newtown, Conn., replaced the school where a mass shooting occurred.

Building Team Awards | Jun 6, 2017

Nerves of steel: 150 North Riverside

Platinum Award: It took guts for a developer and its Building Team to take on a site others had shunned for most of a century.

Building Team Awards | Jun 1, 2016

Multifamily tower and office building revitalize Philadelphia cathedral

The Philadelphia Episcopal Cathedral capitalizes on hot property to help fund much needed upgrades and programs.

Building Team Awards | Jun 1, 2016

Central utility power plant takes center stage at UC San Diego Jacobs Medical Center

An undulating roof, floor-to-ceiling glass, and façade scheme give visual appeal to a plant that serves the 10-story medical center.

Building Team Awards | May 31, 2016

Gonzaga's new student center is a bustling social hub

Retail mall features, comfortable furniture, and floor-to-ceiling glass add vibrancy to the new John J. Hemmingson Center.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021